ITAC Assessment: WV0286
ITAC logo
ITAC Assessment: WV0286
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2004
Principal Product Bent Tube Assemblies
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 80
Plant Area 56,000
ft2
Annual Production 500,000
lb
Production Hrs. Annual 4,080
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $37,720 754,400
kWh
Electricity Demand $20,854 2,620
kW-mo/yr
Electricity Fees $2,953 -
Natural Gas $52,554 6,722
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,331 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $14,039

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $6,216 $7,012 $4,092
75,753
kWh
$2,124
-
kW-mo/yr
- -
02 2.3212: Optimize plant power factor $4,469 $3,580 $4,469
-
kWh
- - -
03 2.7492: Use proper thickness of insulation on building envelope $2,072 $360 - - $2,072
-
MMBtu
-
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,971 $250 $1,374
25,437
kWh
$597
-
kW-mo/yr
- -
05 2.1213: Direct warmest air to combustion intake $1,455 $1,770 - - $1,455
-
MMBtu
-
06 2.2511: Insulate bare equipment $1,353 $251 - - $1,353
-
MMBtu
-
07 2.4151: Develop a repair/replace policy $1,083 $375 $965
17,263
kWh
$418
-
kW-mo/yr
- $(-300.0)
08 2.1233: Analyze flue gas for proper air/fuel ratio $993 $1,000 - - $993
-
MMBtu
-
09 2.7142: Utilize higher efficiency lamps and/or ballasts $830 - $600
11,133
kWh
$230
-
kW-mo/yr
- -
10 2.4322: Use or replace with energy efficient substitutes $828 $283 $577
10,710
kWh
$251
-
kW-mo/yr
- -
11 2.4111: Utilize energy-efficient belts and other improved mechanisms $743 $1,100 $518
9,607
kWh
$225
-
kW-mo/yr
- -
12 2.4221: Install compressor air intakes in coolest locations $318 $250 $221
4,102
kWh
$97
-
kW-mo/yr
- -
TOTAL RECOMMENDED $22,331 $16,231 $12,816
154,005
kWh
$3,942
-
kW-mo/yr
$5,873
-
MMBtu
$(-300.0)
TOTAL IMPLEMENTED $14,039 $7,844 $7,759
60,989
kWh
$1,400
-
kW-mo/yr
$4,880
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs