Assessment Year | 2002 |
---|---|
Principal Product | Printed Steel Sheets |
NAICS |
n/a
|
SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 40 |
Plant Area |
24,000
ft2
|
Annual Production | 144,000,000
pieces
|
Production Hrs. Annual | 6,732
hrs
|
Location (State) | Pennsylvania |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $117,358 | 2,054,800 |
kWh
|
$0.057 |
Electricity Demand | $33,648 | 6,408 |
kW-mo/yr
|
$5.25 |
Natural Gas | $335,854 | 48,713 |
MMBtu
|
$6.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $44,216 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $32,578 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,157 | $1,150 |
$2,526
44,243
kWh
|
$631
-
kW-mo/yr
|
- | - | - | - | |
02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,458 | $60 |
$1,255
21,975
kWh
|
$203
-
kW-mo/yr
|
- | - | - | - | |
03 | 2.2437: Recover waste heat from equipment | $4,650 | $6,000 | - | - |
$4,650
-
MMBtu
|
- | - | - | |
04 | 2.4221: Install compressor air intakes in coolest locations | $1,594 | $180 |
$1,371
24,026
kWh
|
$223
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.2437: Recover waste heat from equipment | $1,871 | $620 | - | - |
$1,871
-
MMBtu
|
- | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,675 | $2,700 | - | - |
$1,675
-
MMBtu
|
- | - | - | |
07 | 2.4157: Establish a predictive maintenance program | $5,097 | $800 |
$4,386
76,473
kWh
|
$711
-
kW-mo/yr
|
- | - | - | - | |
08 | 3.3122: Use filtration, centrifuging to remove contaminants | $1,848 | $4,000 | - | - | - |
$1,848
-
gal
|
- | - | |
09 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $3,872 | $300 | - | - | - | - |
$3,872
-
lb
|
- | |
10 | 4.425: Eliminate/reduce redundant inspections | $18,994 | - | - | - | - | - | - | $18,994 | |
TOTAL RECOMMENDED | $44,216 | $15,810 |
$9,538
166,717
kWh
|
$1,768
-
kW-mo/yr
|
$8,196
-
MMBtu
|
$1,848
-
gal
|
$3,872
-
lb
|
$18,994 | ||
TOTAL IMPLEMENTED | $32,578 | $2,310 |
$8,167
142,691
kWh
|
$1,545
-
kW-mo/yr
|
- | - |
$3,872
-
lb
|
$18,994 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs