| Assessment Year | 2002 |
|---|---|
| Principal Product | Printed Steel Sheets |
| NAICS |
n/a
|
| SIC | 3499: Fabricated Metal Products, Not Elsewhere Classified |
| Sales Range | $5 M to 10M |
| # of Employees | 40 |
| Plant Area |
24,000
ft2
|
| Annual Production | 144,000,000
pieces
|
| Production Hrs. Annual | 6,732
hrs
|
| Location (State) | Pennsylvania |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $117,358 | 2,054,800 |
kWh
|
$0.057 |
| Electricity Demand | $33,648 | 6,408 |
kW-mo/yr
|
$5.25 |
| Natural Gas | $335,854 | 48,713 |
MMBtu
|
$6.89 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,216 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,578 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings |
|---|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $3,157 | $1,150 |
$2,526
44,243
kWh
|
$631
-
kW-mo/yr
|
- | - | - | - | |
| 02 | 2.4231: Reduce the pressure of compressed air to the minimum required | $1,458 | $60 |
$1,255
21,975
kWh
|
$203
-
kW-mo/yr
|
- | - | - | - | |
| 03 | 2.2437: Recover waste heat from equipment | $4,650 | $6,000 | - | - |
$4,650
-
MMBtu
|
- | - | - | |
| 04 | 2.4221: Install compressor air intakes in coolest locations | $1,594 | $180 |
$1,371
24,026
kWh
|
$223
-
kW-mo/yr
|
- | - | - | - | |
| 05 | 2.2437: Recover waste heat from equipment | $1,871 | $620 | - | - |
$1,871
-
MMBtu
|
- | - | - | |
| 06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,675 | $2,700 | - | - |
$1,675
-
MMBtu
|
- | - | - | |
| 07 | 2.4157: Establish a predictive maintenance program | $5,097 | $800 |
$4,386
76,473
kWh
|
$711
-
kW-mo/yr
|
- | - | - | - | |
| 08 | 3.3122: Use filtration, centrifuging to remove contaminants | $1,848 | $4,000 | - | - | - |
$1,848
-
gal
|
- | - | |
| 09 | 3.5248: Separate and recycle scrap metal to foundry or for sale | $3,872 | $300 | - | - | - | - |
$3,872
-
lb
|
- | |
| 10 | 4.425: Eliminate/reduce redundant inspections | $18,994 | - | - | - | - | - | - | $18,994 | |
| TOTAL RECOMMENDED | $44,216 | $15,810 |
$9,538
166,717
kWh
|
$1,768
-
kW-mo/yr
|
$8,196
-
MMBtu
|
$1,848
-
gal
|
$3,872
-
lb
|
$18,994 | ||
| TOTAL IMPLEMENTED | $32,578 | $2,310 |
$8,167
142,691
kWh
|
$1,545
-
kW-mo/yr
|
- | - |
$3,872
-
lb
|
$18,994 | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (non-haz) Savings | Administrative Changes Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs