ITAC Assessment: WV0229
ITAC logo
ITAC Assessment: WV0229
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Truck Bodies and Trailers
NAICS
n/a
SIC 3713: Truck and Bus Bodies
Sales Range $5
M
to 10
M
# of Employees 80
Plant Area 116,800
ft2
Annual Production 600
pieces
Production Hrs. Annual 6,240
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $99,428 1,581,864
kWh
Natural Gas $72,036 9,371
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $100,540 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $83,334

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
01 2.4111: Utilize energy-efficient belts and other improved mechanisms $948 $300 $948
14,943
kWh
- - -
02 2.4157: Establish a predictive maintenance program $776 $750 $776
21,975
kWh
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,684 $4,400 $3,684
58,600
kWh
- - -
04 2.7261: Install timers and/or thermostats $3,599 $350 - $3,599
-
MMBtu
- -
05 2.4314: Use synthetic lubricant $1,215 $450 $1,215
19,338
kWh
- - -
06 2.4221: Install compressor air intakes in coolest locations $755 $400 $755
12,013
kWh
- - -
07 2.2437: Recover waste heat from equipment $861 $400 - $861
-
MMBtu
- -
08 2.7111: Reduce illumination to minimum necessary levels $6,323 $1,200 $6,323
100,499
kWh
- - -
09 2.7144: Install spectral reflectors / delamp $6,189 $11,368 $6,189
98,448
kWh
- - -
10 2.7135: Install occupancy sensors $2,118 $450 $2,118
33,695
kWh
- - -
11 2.4231: Reduce the pressure of compressed air to the minimum required $2,192 $100 $2,192
34,867
kWh
- - -
12 3.4116: Meter recycled water (to reduce sewer charges) $13,680 $220 - - $13,680
-
Tgal
-
13 4.323: Optimize lot sizes to reduce inventory carrying costs $45,000 $15,000 - - - $45,000
14 4.731: Advertise product or service $13,200 $2,000 - - - $13,200
TOTAL RECOMMENDED $100,540 $37,388 $24,200
394,378
kWh
$4,460
-
MMBtu
$13,680
-
Tgal
$58,200
TOTAL IMPLEMENTED $83,334 $20,020 $11,454
191,622
kWh
- $13,680
-
Tgal
$58,200
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs