ITAC Assessment: WV0218
ITAC logo
ITAC Assessment: WV0218
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Closed cell foam
NAICS
n/a
SIC 3069: Fabricated Rubber Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 126
Plant Area 230,000
ft2
Annual Production 11,000
thousand feet
Production Hrs. Annual 3,640
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $115,778 1,965,208
kWh
Natural Gas $30,775 4,793
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $82,448 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $48,299

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings
01 2.4221: Install compressor air intakes in coolest locations $535 $188 $535
9,083
kWh
- - - -
02 2.7241: Install outside air damper / economizer on hvac unit $15,768 $13,800 $15,768
267,802
kWh
- - - -
03 2.2628: Utilize a less expensive cooling method $1,519 $1,362 $1,519
25,784
kWh
- - - -
04 2.2625: Chill water to the highest temperature possible $121 $60 $121
2,051
kWh
- - - -
05 2.7496: Install partitions to reduce size of conditioned space $2,714 $2,520 $2,714
45,708
kWh
- - - -
06 2.7111: Reduce illumination to minimum necessary levels $5,713 $1,440 $5,713
96,983
kWh
- - - -
07 2.2511: Insulate bare equipment $1,985 $276 $1,985
33,695
kWh
- - - -
08 2.2511: Insulate bare equipment $3,625 $730 $3,625
61,530
kWh
- - - -
09 2.4157: Establish a predictive maintenance program $1,088 $1,200 $1,448
30,765
kWh
- - $(-360.0) -
10 3.5212: Regrind, reuse, or sell scrap plastic parts $5,940 - - - $5,940
-
lb
- -
11 3.6192: Use a less expensive method of waste removal $18,480 $9,000 - $18,480
-
lb
- - -
12 4.446: Automate finishing process $24,960 $1,600 - - - - $24,960
TOTAL RECOMMENDED $82,448 $32,176 $33,428
573,401
kWh
$18,480
-
lb
$5,940
-
lb
$(-360.0) $24,960
TOTAL IMPLEMENTED $48,299 $27,868 $30,179
518,610
kWh
$18,480
-
lb
- $(-360.0) -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Solid Waste (non-haz) Savings Solid Waste (haz) Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs