ITAC Assessment: UA3017
ITAC logo
ITAC Assessment: UA3017
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2011
Principal Product Chlorine
NAICS 325180: Other Basic Inorganic Chemical Manufacturing
SIC 2812: Alkalies and Chlorine
Sales Range $100
M
to 500
M
# of Employees 318
Plant Area 351,422
ft2
Annual Production 636,410
ton
Production Hrs. Annual 8,520
hrs
Location (State) Alabama

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $12,367,470 224,863,000
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $279,652 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $25,000

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $25,000 $10,000 $25,000
454,548
kWh
02 2.4226: Use / purchase optimum sized compressor $49,053 $187,000 $49,053
891,876
kWh
03 2.4226: Use / purchase optimum sized compressor $201,277 $312,000 $201,277
3,659,578
kWh
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,322 $800 $4,322
78,588
kWh
TOTAL RECOMMENDED $279,652 $509,800 $279,652
5,084,590
kWh
TOTAL IMPLEMENTED $25,000 $10,000 $25,000
454,548
kWh
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs