| Assessment Year | 2001 |
|---|---|
| Principal Product | Wodden Pallets |
| NAICS |
n/a
|
| SIC | 2448: Wood Pallets and Skids |
| Sales Range | $10 M to 50M |
| # of Employees | 148 |
| Plant Area |
300,000
ft2
|
| Annual Production | 182,500
thousand feet
|
| Production Hrs. Annual | 4,030
hrs
|
| Location (State) | West Virginia |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $142,113 | 2,135,794 |
kWh
|
$0.067 |
| Natural Gas | $65,667 | 8,144 |
MMBtu
|
$8.06 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $130,374 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $32,411 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Product Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $1,786 | $448 | - |
$1,786
-
MMBtu
|
- | - | - | |
| 02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $710 | $37 |
$710
10,548
kWh
|
- | - | - | - | |
| 03 | 2.4221: Install compressor air intakes in coolest locations | $2,808 | $730 |
$2,808
42,192
kWh
|
- | - | - | - | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $3,198 | $54 |
$3,198
48,052
kWh
|
- | - | - | - | |
| 05 | 2.4157: Establish a predictive maintenance program | $5,488 | $740 |
$5,488
82,333
kWh
|
- | - | - | - | |
| 06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,633 | $900 |
$2,633
39,555
kWh
|
- | - | - | - | |
| 07 | 2.6213: Turn off steam / hot water lines leading to space heating units | $3,772 | - | - |
$3,772
-
MMBtu
|
- | - | - | |
| 08 | 2.2515: Use optimum thickness insulation | $8,599 | $7,303 | - |
$8,599
-
MMBtu
|
- | - | - | |
| 09 | 2.7447: Install vinyl strip / high speed / air curtain doors | $4,808 | $4,423 | - |
$4,808
-
MMBtu
|
- | - | - | |
| 10 | 2.6218: Turn off equipment when not in use | $11,622 | - |
$11,622
145,328
kWh
|
- | - | - | - | |
| 11 | 3.5211: Reuse scrap glass as feed stock | $180 | - | - | - |
$180
-
lb
|
- | - | |
| 12 | 4.652: Replace existing equipment with more suitable substitutes | $20,000 | $24,000 | - | - | - | - | $20,000 | |
| 13 | 4.652: Replace existing equipment with more suitable substitutes | $15,000 | $1,212 | - | - | - | - | $15,000 | |
| 14 | 4.424: Improve space comfort conditioning | $49,770 | $18,000 | - | - | - | $49,770 | - | |
| TOTAL RECOMMENDED | $130,374 | $57,847 |
$26,459
368,008
kWh
|
$18,965
-
MMBtu
|
$180
-
lb
|
$49,770 | $35,000 | ||
| TOTAL IMPLEMENTED | $32,411 | $6,154 |
$23,651
325,816
kWh
|
$8,580
-
MMBtu
|
$180
-
lb
|
- | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Solid Waste (haz) Savings | Administrative Changes Savings | Primary Product Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs