ITAC Assessment: WV0210
ITAC logo
ITAC Assessment: WV0210
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Wodden Pallets
NAICS
n/a
SIC 2448: Wood Pallets and Skids
Sales Range $10
M
to 50
M
# of Employees 148
Plant Area 300,000
ft2
Annual Production 182,500
thousand feet
Production Hrs. Annual 4,030
hrs
Location (State) West Virginia

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $142,113 2,135,794
kWh
Natural Gas $65,667 8,144
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $130,374 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $32,411

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Product Savings
01 2.2437: Recover waste heat from equipment $1,786 $448 - $1,786
-
MMBtu
- - -
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $710 $37 $710
10,548
kWh
- - - -
03 2.4221: Install compressor air intakes in coolest locations $2,808 $730 $2,808
42,192
kWh
- - - -
04 2.4231: Reduce the pressure of compressed air to the minimum required $3,198 $54 $3,198
48,052
kWh
- - - -
05 2.4157: Establish a predictive maintenance program $5,488 $740 $5,488
82,333
kWh
- - - -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,633 $900 $2,633
39,555
kWh
- - - -
07 2.6213: Turn off steam / hot water lines leading to space heating units $3,772 - - $3,772
-
MMBtu
- - -
08 2.2515: Use optimum thickness insulation $8,599 $7,303 - $8,599
-
MMBtu
- - -
09 2.7447: Install vinyl strip / high speed / air curtain doors $4,808 $4,423 - $4,808
-
MMBtu
- - -
10 2.6218: Turn off equipment when not in use $11,622 - $11,622
145,328
kWh
- - - -
11 3.5211: Reuse scrap glass as feed stock $180 - - - $180
-
lb
- -
12 4.652: Replace existing equipment with more suitable substitutes $20,000 $24,000 - - - - $20,000
13 4.652: Replace existing equipment with more suitable substitutes $15,000 $1,212 - - - - $15,000
14 4.424: Improve space comfort conditioning $49,770 $18,000 - - - $49,770 -
TOTAL RECOMMENDED $130,374 $57,847 $26,459
368,008
kWh
$18,965
-
MMBtu
$180
-
lb
$49,770 $35,000
TOTAL IMPLEMENTED $32,411 $6,154 $23,651
325,816
kWh
$8,580
-
MMBtu
$180
-
lb
- -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (haz) Savings Administrative Changes Savings Primary Product Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs