ITAC Assessment: UM0086
ITAC logo
ITAC Assessment: UM0086
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Printed forms and envelopes
NAICS
n/a
SIC 2752: Commercial Printing, Lithographic
Sales Range $10
M
to 50
M
# of Employees 160
Plant Area 51,000
ft2
Annual Production 5,000,000
lb
Production Hrs. Annual 6,864
hrs
Location (State) Michigan

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $143,030 2,315,065
kWh
Electricity Demand $55,210 5,867
kW-mo/yr
Electricity Fees $8,662 -
Natural Gas $12,822 3,000
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,184 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $24,588

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Other Liquid (haz) Savings Personnel Changes Savings Primary Raw Material Savings Primary Product Savings
01 2.4133: Use most efficient type of electric motors $7,640 $7,640 $5,698
118,113
kWh
$1,942
-
kW-mo/yr
- - - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $23,988 $23,988 $19,329
196,366
kWh
$4,659
-
kW-mo/yr
- - - -
03 2.4221: Install compressor air intakes in coolest locations $600 $600 $521
3,224
kWh
$79
-
kW-mo/yr
- - - -
04 3.5121: Recycle waste ink and cleanup solvent $1,270 $5,080 - - $718
-
gal
$(-472.0) $1,024 -
05 2.7243: Improve air circulation with destratification fans / other methods $26,686 $1,500 - - - - - $26,686
TOTAL RECOMMENDED $60,184 $38,808 $25,548
317,703
kWh
$6,680
-
kW-mo/yr
$718
-
gal
$(-472.0) $1,024 $26,686
TOTAL IMPLEMENTED $24,588 $24,588 $19,850
199,590
kWh
$4,738
-
kW-mo/yr
- - - -
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs