Assessment Year | 2021 |
---|---|
Principal Product | Cheese |
NAICS | 311513: Cheese Manufacturing |
SIC | 2022: Natural, Processed, and Imitation Cheese |
Sales Range | $100 M to 500M |
# of Employees | 432 |
Plant Area |
284,551
ft2
|
Annual Production | 51,340,575
lb
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $678,196 | 11,695,030 |
kWh
|
$0.058 |
Electricity Demand | $305,983 | 21,292 |
kW-mo/yr
|
$14.37 |
Electricity Fees | $59,300 | - |
|
- |
Natural Gas | $95,371 | 29,218 |
MMBtu
|
$3.26 |
TOTAL YEARLY COSTS | $1,138,850 | |||
RECOMMENDED SAVINGS* | $51,218 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.2414: Use waste heat from hot flue gases to preheat | $17,131 | $40,000 | - | - |
$17,131
-
MMBtu
|
|
02 | 2.4239: Eliminate or reduce compressed air usage | $14,431 | - |
$10,327
178,055
kWh
|
$4,104
-
kW-mo/yr
|
- | |
03 | 2.2531: Re-size charging openings or add movable cover or door | $4,101 | $3,100 | - | - |
$4,101
-
MMBtu
|
|
04 | 2.4227: Use compressor air filters | $3,566 | $7,132 |
$2,551
43,990
kWh
|
$1,015
-
kW-mo/yr
|
- | |
05 | 2.7221: Lower temperature during the winter season and vice-versa | $3,276 | - |
$3,276
56,486
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $2,848 | $2,571 |
$2,038
35,132
kWh
|
$811
-
kW-mo/yr
|
- | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,532 | $3,750 |
$1,812
31,238
kWh
|
$720
-
kW-mo/yr
|
- | |
08 | 2.7444: Close holes and openings in building such as broken windows | $1,982 | $4,125 | - | - |
$1,982
-
MMBtu
|
|
09 | 2.7135: Install occupancy sensors | $1,350 | $930 |
$1,034
17,821
kWh
|
$317
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $51,218 | $61,608 |
$21,037
362,722
kWh
|
$6,967
-
kW-mo/yr
|
$23,214
-
MMBtu
|
||
TOTAL IMPLEMENTED | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs