ITAC Assessment: AM0857
ITAC logo
ITAC Assessment: AM0857
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2022
Principal Product Hot dog and Hamburger Buns
NAICS 311812: Commercial Bakeries
SIC 2051: Bread and Other Bakery Products, Except Cookies and Crackers
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area 137,000
ft2
Annual Production 500,000,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $373,062 7,206,939
kWh
Electricity Demand $123,084 16,780
kW-mo/yr
Electricity Fees $54,157 -
Natural Gas $258,994 51,069
MMBtu
TOTAL YEARLY COSTS $809,297
RECOMMENDED SAVINGS* $244,480 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
01 2.8121: Apply for tax-free status for energy purchases $204,900 $15,000 - - $40,900 - - - $164,000
02 2.3212: Optimize plant power factor $16,640 $31,840 - $16,640
-
kW-mo/yr
- - - - -
03 2.1241: Reduce excessive boiler blowdown $4,554 $3,000 - - - $224
-
MMBtu
$4,330
-
Tgal
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $11,296 $1,600 $9,150
176,000
kWh
$2,146
-
kW-mo/yr
- - - - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $296 $54 $226
4,344
kWh
$70
-
kW-mo/yr
- - - - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $6,794 $4,255 $6,280
120,680
kWh
$510
-
kW-mo/yr
- - - $4 -
TOTAL RECOMMENDED $244,480 $55,749 $15,656
301,024
kWh
$19,366
-
kW-mo/yr
$40,900 $224
-
MMBtu
$4,330
-
Tgal
$4 $164,000
TOTAL IMPLEMENTED - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Water Usage Savings Ancillary Material Cost Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs