ITAC Assessment: MI0115
ITAC logo
ITAC Assessment: MI0115
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Metal Lockers
NAICS 337215: Showcase, Partition, Shelving, and Locker Manufacturing
SIC 2542: Office and Store Fixtures, Partitions, Shelving, and Lockers, Except Wood
Sales Range $10
M
to 50
M
# of Employees 270
Plant Area 100,000
ft2
Annual Production 100,000
pieces
Production Hrs. Annual 5,900
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $224,493 4,424,160
kWh
Electricity Demand $92,043 11,164
kW-mo/yr
Electricity Fees $21,984 -
Natural Gas $296,818 42,403
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $148,212 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $110,009

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $94,802 $420 $3,388
66,778
kWh
$1,414
-
kW-mo/yr
- $90,000
02 2.7447: Install vinyl strip / high speed / air curtain doors $33,460 $2,314 - - $33,460
-
MMBtu
-
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $10,435 $1,074 $8,444
166,419
kWh
$1,991
-
kW-mo/yr
- -
04 2.4231: Reduce the pressure of compressed air to the minimum required $4,743 $4,732 $3,209
63,244
kWh
$1,534
-
kW-mo/yr
- -
05 2.4323: Use optimum size and capacity equipment $2,775 $6,660 $2,134
42,062
kWh
$641
-
kW-mo/yr
- -
06 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,997 - $1,363
26,856
kWh
$634
-
kW-mo/yr
- -
TOTAL RECOMMENDED $148,212 $15,200 $18,538
365,359
kWh
$6,214
-
kW-mo/yr
$33,460
-
MMBtu
$90,000
TOTAL IMPLEMENTED $110,009 $8,154 $15,329
302,115
kWh
$4,680
-
kW-mo/yr
- $90,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs