ITAC Assessment: WM0155
ITAC logo
ITAC Assessment: WM0155
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Underground Construction Equipment
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 136,500
ft2
Annual Production 3,000
pieces
Production Hrs. Annual 4,375
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $80,586 912,640
kWh
Electricity Demand $22,138 2,992
kW-mo/yr
Electricity Fees $108,921 -
Natural Gas $26,830 4,462
MMBtu
Waste Disposal Costs
Water Usage $2,661 165
Tgal
Water Disposal $1,919 165
Tgal
TOTAL YEARLY COSTS $243,055
RECOMMENDED SAVINGS* $42,920 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $726

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.9114: Use solar heat to make electricty $26,709 $110,788 $26,709
302,487
kWh
- -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $6,927 $8,716 $6,568
74,378
kWh
$359
-
kW-mo/yr
-
03 2.7444: Close holes and openings in building such as broken windows $2,335 $1,700 - - $2,335
-
MMBtu
04 2.7232: Replace existing hvac unit with high efficiency model $1,791 $15,060 - - $1,791
-
MMBtu
05 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,761 $3,855 $1,517
17,177
kWh
$244
-
kW-mo/yr
-
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,679 $1,750 $1,365
15,461
kWh
$314
-
kW-mo/yr
-
07 2.7134: Use photocell controls $541 $1,075 $541
6,127
kWh
- -
08 2.7135: Install occupancy sensors $451 $750 $396
4,485
kWh
$55
-
kW-mo/yr
-
09 2.4221: Install compressor air intakes in coolest locations $366 $1,250 $297
3,373
kWh
$69
-
kW-mo/yr
-
10 2.7111: Reduce illumination to minimum necessary levels $360 - $293
3,308
kWh
$67
-
kW-mo/yr
-
TOTAL RECOMMENDED $42,920 $144,944 $37,686
426,796
kWh
$1,108
-
kW-mo/yr
$4,126
-
MMBtu
TOTAL IMPLEMENTED $726 $1,250 $590
6,681
kWh
$136
-
kW-mo/yr
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs