ITAC Assessment: IP0134
ITAC logo
ITAC Assessment: IP0134
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2020
Principal Product Potable Drinking Water
NAICS 221310: Water Supply and Irrigation Systems
SIC 4941: Water Supply
Sales Range $10
M
to 50
M
# of Employees 5
Plant Area 530,820
ft2
Annual Production 4,335,000
Tgal
Production Hrs. Annual 8,760
hrs
Location (State) Indiana

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $188,631 5,419,400
kWh
Electricity Demand $261,079 11,762
kW-mo/yr
Electricity Fees $(-10,376.0) -
Natural Gas $7,494 1,441
MMBtu
TOTAL YEARLY COSTS $446,828
RECOMMENDED SAVINGS* $31,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,106

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings
01 2.7221: Lower temperature during the winter season and vice-versa $1,050 $660 - - $1,050
-
MMBtu
02 2.7142: Utilize higher efficiency lamps and/or ballasts $3,106 $2,237 $2,482
71,319
kWh
$624
-
kW-mo/yr
-
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $27,816 $28,862 $32
930
kWh
$27,784
-
kW-mo/yr
-
TOTAL RECOMMENDED $31,972 $31,759 $2,514
72,249
kWh
$28,408
-
kW-mo/yr
$1,050
-
MMBtu
TOTAL IMPLEMENTED $3,106 $2,237 $2,482
71,319
kWh
$624
-
kW-mo/yr
-
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs