Assessment Year | 1993 |
---|---|
Principal Product | LOCOMOTIVE REMANUFACTURE |
NAICS |
n/a
|
SIC | 3519: Internal Combustion Engines, Not Elsewhere Classified |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
n/a
|
Annual Production | 612
pieces
|
Production Hrs. Annual | 2,668
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $175,352 | 2,207,503 |
kWh
|
$0.079 |
Natural Gas | $73,153 | 31,071 |
MMBtu
|
$2.35 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $60,998 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $56,813 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $33,534 | $4,388 |
$38,376
483,001
kWh
|
$(-4,842.0)
-
MMBtu
|
- | |
02 | 2.2511: Insulate bare equipment | $3,716 | $648 |
$3,716
46,893
kWh
|
- | - | |
03 | 2.8114: Change rate schedules or other changes in utility service | $13,920 | $6,676 |
$13,920
-
kWh
|
- | - | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,322 | $2,500 |
$4,322
54,513
kWh
|
- | - | |
05 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,740 | $2,585 |
$4,832
60,961
kWh
|
- | $(-92.0) | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $297 | - |
$377
4,689
kWh
|
- | $(-80.0) | |
07 | 2.4133: Use most efficient type of electric motors | $469 | $2,751 |
$469
5,862
kWh
|
- | - | |
TOTAL RECOMMENDED | $60,998 | $19,548 |
$66,012
655,919
kWh
|
$(-4,842.0)
-
MMBtu
|
$(-172.0) | ||
TOTAL IMPLEMENTED | $56,813 | $16,149 |
$61,827
603,164
kWh
|
$(-4,842.0)
-
MMBtu
|
$(-172.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs