ITAC Assessment: IA0064
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1993
Principal Product LOCOMOTIVE REMANUFACTURE
NAICS
n/a
SIC 3519: Internal Combustion Engines, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area
n/a
Annual Production 612
pieces
Production Hrs. Annual 2,668
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $175,352 2,207,503
kWh
Natural Gas $73,153 31,071
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $60,998 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $56,813

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $33,534 $4,388 $38,376
483,001
kWh
$(-4,842.0)
-
MMBtu
-
02 2.2511: Insulate bare equipment $3,716 $648 $3,716
46,893
kWh
- -
03 2.8114: Change rate schedules or other changes in utility service $13,920 $6,676 $13,920
-
kWh
- -
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,322 $2,500 $4,322
54,513
kWh
- -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $4,740 $2,585 $4,832
60,961
kWh
- $(-92.0)
06 2.7142: Utilize higher efficiency lamps and/or ballasts $297 - $377
4,689
kWh
- $(-80.0)
07 2.4133: Use most efficient type of electric motors $469 $2,751 $469
5,862
kWh
- -
TOTAL RECOMMENDED $60,998 $19,548 $66,012
655,919
kWh
$(-4,842.0)
-
MMBtu
$(-172.0)
TOTAL IMPLEMENTED $56,813 $16,149 $61,827
603,164
kWh
$(-4,842.0)
-
MMBtu
$(-172.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs