| Assessment Year | 2006 |
|---|---|
| Principal Product | Outboard engines |
| NAICS | 333618: Other Engine Equipment Manufacturing |
| SIC | 3732: Boat Building and Repairing |
| Sales Range | $10 M to 50M |
| # of Employees | 125 |
| Plant Area |
122,000
ft2
|
| Annual Production | 2,600
pieces
|
| Production Hrs. Annual | 2,250
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $94,756 | 2,492,999 |
kWh
|
$0.038 |
| Electricity Demand | $63,561 | 8,269 |
kW-mo/yr
|
$7.69 |
| Natural Gas | $71,521 | 7,422 |
MMBtu
|
$9.64 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $65,952 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $19,433 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7261: Install timers and/or thermostats | $12,014 | - |
$567
14,206
kWh
|
$157
-
kW-mo/yr
|
$11,290
-
MMBtu
|
|
| 02 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $8,865 | $2,000 |
$4,811
120,583
kWh
|
$4,054
-
kW-mo/yr
|
- | |
| 03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $5,944 | $23,000 |
$2,859
71,662
kWh
|
$3,085
-
kW-mo/yr
|
- | |
| 04 | 2.2437: Recover waste heat from equipment | $4,554 | $1,000 | - | - |
$4,554
-
MMBtu
|
|
| 05 | 2.7491: Insulate glazing, walls, ceilings, and roofs | $32,657 | $3,352 |
$32,657
32,657
kWh
|
- | - | |
| 06 | 2.4221: Install compressor air intakes in coolest locations | $1,135 | $640 |
$808
20,258
kWh
|
$327
-
kW-mo/yr
|
- | |
| 07 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $443 | $438 |
$190
4,759
kWh
|
$253
-
kW-mo/yr
|
- | |
| 08 | 2.6232: Install set-back timers | $340 | $100 | - |
$340
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $65,952 | $30,530 |
$41,892
264,125
kWh
|
$8,216
-
kW-mo/yr
|
$15,844
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $19,433 | $23,740 |
$4,234
106,126
kWh
|
$3,909
-
kW-mo/yr
|
$11,290
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs