ITAC Assessment: WI0487
ITAC logo
ITAC Assessment: WI0487
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Radiators
NAICS 336390: Other Motor Vehicle Parts Manufacturing
SIC 3714: Motor Vehicle Parts and Accessories
Sales Range $5
M
to 10
M
# of Employees 85
Plant Area 40,000
ft2
Annual Production 1,500
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $50,314 1,505,520
kWh
Electricity Demand $40,904 4,374
kW-mo/yr
Electricity Fees $18,298 -
Natural Gas $40,774 5,204
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $20,971 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,513

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $5,912 $11,200 $3,632
102,900
kWh
$2,280
-
kW-mo/yr
- -
02 2.7144: Install spectral reflectors / delamp $933 - $573
16,236
kWh
$360
-
kW-mo/yr
- -
03 2.7313: Recycle air for heating, ventilation and air conditioning $5,262 $5,600 - - $5,262
-
MMBtu
-
04 2.4239: Eliminate or reduce compressed air usage $1,836 $780 $84
2,378
kWh
$1,752
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $714 $1,280 $430
12,187
kWh
$284
-
kW-mo/yr
- -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $334 $400 $334
9,462
kWh
- - -
07 2.7261: Install timers and/or thermostats $1,350 $1,200 - - $1,350
-
MMBtu
-
08 2.7447: Install vinyl strip / high speed / air curtain doors $1,185 $1,400 $(-9.0)
(-252)
kWh
- $1,194
-
MMBtu
-
09 4.821: Pay bills on time to avoid late fees $1,172 - - - - $1,172
10 2.2621: Modify refrigeration system to operate at a lower pressure $1,165 $3,000 $686
19,440
kWh
$479
-
kW-mo/yr
- -
11 2.2514: Cover open tanks $1,108 $360 - - $1,108
-
MMBtu
-
TOTAL RECOMMENDED $20,971 $25,220 $5,730
162,351
kWh
$5,155
-
kW-mo/yr
$8,914
-
MMBtu
$1,172
TOTAL IMPLEMENTED $17,513 $20,460 $5,053
143,163
kWh
$4,676
-
kW-mo/yr
$6,612
-
MMBtu
$1,172
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs