Assessment Year | 1992 |
---|---|
Principal Product | PLASTIC INJECT. MOLDINGS |
NAICS |
n/a
|
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $5 M to 10M |
# of Employees | 50 |
Plant Area |
n/a
|
Annual Production | 200,000
lb
|
Production Hrs. Annual | 6,120
hrs
|
Location (State) | Connecticut |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $138,849 | 1,468,640 |
kWh
|
$0.095 |
Natural Gas | $3,435 | 340 |
MMBtu
|
$10.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $5,818 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,427 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
---|---|---|---|---|---|---|
01 | 2.2614: Use cooling tower or economizer to replace chiller cooling | $1,746 | $3,614 |
$1,746
18,464
kWh
|
- | |
02 | 2.2511: Insulate bare equipment | $1,358 | $2,672 |
$1,358
14,361
kWh
|
- | |
03 | 2.2437: Recover waste heat from equipment | $1,645 | $1,995 | - |
$1,645
-
MMBtu
|
|
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $526 | - |
$526
5,569
kWh
|
- | |
05 | 2.4221: Install compressor air intakes in coolest locations | $443 | $386 |
$443
4,689
kWh
|
- | |
06 | 2.6232: Install set-back timers | $100 | $85 |
$100
1,172
kWh
|
- | |
TOTAL RECOMMENDED | $5,818 | $8,752 |
$4,173
44,255
kWh
|
$1,645
-
MMBtu
|
||
TOTAL IMPLEMENTED | $2,427 | $3,143 |
$2,427
25,791
kWh
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs