ITAC Assessment: WI0455
ITAC logo
ITAC Assessment: WI0455
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Pipe Fabrications
NAICS 332996: Fabricated Pipe and Pipe Fitting Manufacturing
SIC 3498: Fabricated Pipe and Pipe Fittings
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 90,000
ft2
Annual Production 25,000,000
lb
Production Hrs. Annual 3,800
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $47,600 2,080,720
kWh
Electricity Demand $25,111 6,094
kW-mo/yr
Electricity Fees $25,148 -
Natural Gas $48,730 80,237
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $35,635 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $17,710

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
01 4.111: Add equipment/ operators to reduce production bottleneck $17,710 $2,500 - - - $17,710
02 4.111: Add equipment/ operators to reduce production bottleneck $12,503 $2,000 - - $12,503
-
MMBtu
-
03 2.7261: Install timers and/or thermostats $1,687 $1,000 - - $1,687
-
MMBtu
-
04 2.4234: Cool compressor air intake with heat exchanger $1,787 - $1,191
49,609
kWh
$596
-
kW-mo/yr
- -
05 2.4221: Install compressor air intakes in coolest locations $1,232 $1,240 $767
31,951
kWh
$465
-
kW-mo/yr
- -
06 2.3131: Reschedule plant operations or reduce load to avoid peaks $716 - - $716
-
kW-mo/yr
- -
TOTAL RECOMMENDED $35,635 $6,740 $1,958
81,560
kWh
$1,777
-
kW-mo/yr
$14,190
-
MMBtu
$17,710
TOTAL IMPLEMENTED $17,710 $2,500 - - - $17,710
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs