| Assessment Year | 2022 |
|---|---|
| Principal Product | Sporting Goods |
| NAICS | 451110: Sporting Goods Stores |
| SIC | 5941: Sporting Goods Stores and Bicycle Shops |
| Sales Range | $10 M to 50M |
| # of Employees | 209 |
| Plant Area |
165,000
ft2
|
| Annual Production | 1
units
|
| Production Hrs. Annual | 5,096
hrs
|
| Location (State) | Arizona |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $253,366 | 4,158,929 |
kWh
|
$0.061 |
| Electricity Demand | $73,026 | 7,724 |
kW-mo/yr
|
$9.45 |
| Electricity Fees | $40,089 | - |
|
- |
| Natural Gas | $1,097 | 67 |
MMBtu
|
$16.42 |
| TOTAL YEARLY COSTS | $367,578 | |||
| RECOMMENDED SAVINGS* | $88,945 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $56,294 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 4.611: Begin a practice of predictive / preventative maintenance | $24,479 | $45,639 |
$24,479
401,954
kWh
|
- | - | |
| 02 | 2.6218: Turn off equipment when not in use | $407 | $133 |
$107
1,752
kWh
|
$22
-
kW-mo/yr
|
$278
-
MMBtu
|
|
| 03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $7,894 | $22,335 |
$6,510
106,896
kWh
|
$1,384
-
kW-mo/yr
|
- | |
| 04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $55,838 | $170,361 |
$43,061
707,075
kWh
|
$12,777
-
kW-mo/yr
|
- | |
| 05 | 2.1134: Eliminate leaks in combustible gas lines | $49 | $165 | - | - |
$49
-
MMBtu
|
|
| 06 | 2.7212: Install or upgrade insulation on hvac distribution systems | $278 | $189 |
$167
2,746
kWh
|
$111
-
kW-mo/yr
|
- | |
| TOTAL RECOMMENDED | $88,945 | $238,822 |
$74,324
1,220,423
kWh
|
$14,294
-
kW-mo/yr
|
$327
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $56,294 | $170,659 |
$43,168
708,827
kWh
|
$12,799
-
kW-mo/yr
|
$327
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs