Assessment Year | 1988 |
---|---|
Principal Product | PAPERBOARD |
NAICS |
n/a
|
SIC | 2631: Paperboard Mills |
Sales Range | $10 M to 50M |
# of Employees | 120 |
Plant Area |
n/a
|
Annual Production | 57,256
ton
|
Production Hrs. Annual | 8,472
hrs
|
Location (State) | Ohio |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $903,980 | 22,293,084 |
kWh
|
$0.041 |
Natural Gas | $952,116 | 374,435 |
MMBtu
|
$2.54 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $229,283 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $63,750 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.4239: Eliminate or reduce compressed air usage | $7,611 | $600 |
$7,611
212,192
kWh
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $462 | - |
$462
21,102
kWh
|
- | - | |
03 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $10,213 | $7,000 |
$10,213
317,409
kWh
|
- | - | |
04 | 2.2135: Repair and eliminate steam leaks | $21,603 | $5,000 | - |
$21,603
-
MMBtu
|
- | |
05 | 2.2449: Recover heat from exhausted steam, hot air or hot water | $23,169 | $20,000 | - |
$23,169
-
MMBtu
|
- | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,639 | $11,475 |
$2,607
81,184
kWh
|
- | $(-968.0) | |
07 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $9,266 | $30,000 | - | - | $9,266 | |
08 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $155,320 | $875,000 |
$220,129
6,864,303
kWh
|
$(-64,809.0)
-
MMBtu
|
- | |
TOTAL RECOMMENDED | $229,283 | $949,075 |
$241,022
7,496,190
kWh
|
$(-20,037.0)
-
MMBtu
|
$8,298 | ||
TOTAL IMPLEMENTED | $63,750 | $67,075 |
$10,680
314,478
kWh
|
$44,772
-
MMBtu
|
$8,298 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs