ITAC Assessment: UD0266
ITAC logo
ITAC Assessment: UD0266
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1988
Principal Product PAPERBOARD
NAICS
n/a
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 120
Plant Area
n/a
Annual Production 57,256
ton
Production Hrs. Annual 8,472
hrs
Location (State) Ohio

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $903,980 22,293,084
kWh
Natural Gas $952,116 374,435
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $229,283 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $63,750

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.4239: Eliminate or reduce compressed air usage $7,611 $600 $7,611
212,192
kWh
- -
02 2.4239: Eliminate or reduce compressed air usage $462 - $462
21,102
kWh
- -
03 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $10,213 $7,000 $10,213
317,409
kWh
- -
04 2.2135: Repair and eliminate steam leaks $21,603 $5,000 - $21,603
-
MMBtu
-
05 2.2449: Recover heat from exhausted steam, hot air or hot water $23,169 $20,000 - $23,169
-
MMBtu
-
06 2.7142: Utilize higher efficiency lamps and/or ballasts $1,639 $11,475 $2,607
81,184
kWh
- $(-968.0)
07 3.6193: Install equipment (eg compactor) to reduce disposal costs $9,266 $30,000 - - $9,266
08 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $155,320 $875,000 $220,129
6,864,303
kWh
$(-64,809.0)
-
MMBtu
-
TOTAL RECOMMENDED $229,283 $949,075 $241,022
7,496,190
kWh
$(-20,037.0)
-
MMBtu
$8,298
TOTAL IMPLEMENTED $63,750 $67,075 $10,680
314,478
kWh
$44,772
-
MMBtu
$8,298
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs