Assessment Year | 1997 |
---|---|
Principal Product | multiwall paper bags |
NAICS |
n/a
|
SIC | 2693: |
Sales Range | $50 M to 100M |
# of Employees | 300 |
Plant Area |
128,900
ft2
|
Annual Production | 33,000
ton
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Missouri |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $258,387 | 5,182,591 |
kWh
|
$0.050 |
Electricity Demand | $60,518 | 11,880 |
kW-mo/yr
|
$5.09 |
Natural Gas | $127,604 | 22,586 |
MMBtu
|
$5.65 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $77,650 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $74,040 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.4133: Use most efficient type of electric motors | $5,850 | $8,570 |
$5,110
102,286
kWh
|
$740
-
kW-mo/yr
|
- | - | - | |
02 | 2.4221: Install compressor air intakes in coolest locations | $4,530 | $410 |
$3,890
77,960
kWh
|
$640
-
kW-mo/yr
|
- | - | - | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $4,350 | $380 |
$3,740
74,736
kWh
|
$610
-
kW-mo/yr
|
- | - | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,220 | $15,180 |
$3,630
72,685
kWh
|
$590
-
kW-mo/yr
|
- | - | - | |
05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $2,320 | $500 |
$2,040
40,739
kWh
|
$280
-
kW-mo/yr
|
- | - | - | |
06 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $730 | $1,240 |
$1,160
23,154
kWh
|
$130
-
kW-mo/yr
|
- | - | - | |
07 | 2.2511: Insulate bare equipment | $560 | $400 | - | - | - | - | - | |
08 | 3.4111: Use closed cycle process to minimize waste water production | $5,090 | $12,000 |
$(-110.0)
(-2,052)
kWh
|
$(-20.0)
-
kW-mo/yr
|
$2,960
-
Tgal
|
- |
$2,260
-
Tgal
|
|
09 | 4.711: Initiate a total quality management program | $50,000 | $13,360 | - | - | - | $50,000 | - | |
TOTAL RECOMMENDED | $77,650 | $52,040 |
$19,460
389,508
kWh
|
$2,970
-
kW-mo/yr
|
$2,960
-
Tgal
|
$50,000 |
$2,260
-
Tgal
|
||
TOTAL IMPLEMENTED | $74,040 | $49,900 |
$16,260
325,615
kWh
|
$2,560
-
kW-mo/yr
|
$2,960
-
Tgal
|
$50,000 |
$2,260
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Water Disposal Savings | Personnel Changes Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs