ITAC Assessment: KU0482
ITAC logo
ITAC Assessment: KU0482
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product multiwall paper bags
NAICS
n/a
SIC 2693:
Sales Range $50
M
to 100
M
# of Employees 300
Plant Area 128,900
ft2
Annual Production 33,000
ton
Production Hrs. Annual 7,488
hrs
Location (State) Missouri

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,387 5,182,591
kWh
Electricity Demand $60,518 11,880
kW-mo/yr
Natural Gas $127,604 22,586
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $77,650 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $74,040

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
01 2.4133: Use most efficient type of electric motors $5,850 $8,570 $5,110
102,286
kWh
$740
-
kW-mo/yr
- - -
02 2.4221: Install compressor air intakes in coolest locations $4,530 $410 $3,890
77,960
kWh
$640
-
kW-mo/yr
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $4,350 $380 $3,740
74,736
kWh
$610
-
kW-mo/yr
- - -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $4,220 $15,180 $3,630
72,685
kWh
$590
-
kW-mo/yr
- - -
05 2.4111: Utilize energy-efficient belts and other improved mechanisms $2,320 $500 $2,040
40,739
kWh
$280
-
kW-mo/yr
- - -
06 2.1311: Replace electrically-operated equipment with fossil fuel equipment $730 $1,240 $1,160
23,154
kWh
$130
-
kW-mo/yr
- - -
07 2.2511: Insulate bare equipment $560 $400 - - - - -
08 3.4111: Use closed cycle process to minimize waste water production $5,090 $12,000 $(-110.0)
(-2,052)
kWh
$(-20.0)
-
kW-mo/yr
$2,960
-
Tgal
- $2,260
-
Tgal
09 4.711: Initiate a total quality management program $50,000 $13,360 - - - $50,000 -
TOTAL RECOMMENDED $77,650 $52,040 $19,460
389,508
kWh
$2,970
-
kW-mo/yr
$2,960
-
Tgal
$50,000 $2,260
-
Tgal
TOTAL IMPLEMENTED $74,040 $49,900 $16,260
325,615
kWh
$2,560
-
kW-mo/yr
$2,960
-
Tgal
$50,000 $2,260
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Water Disposal Savings Personnel Changes Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs