Assessment Year | 1999 |
---|---|
Principal Product | Subsurface oilwell pumps, pumping equipment |
NAICS |
n/a
|
SIC | 3533: Oil and Gas Field Machinery and Equipment |
Sales Range | $50 M to 100M |
# of Employees | 250 |
Plant Area |
500,000
ft2
|
Annual Production | 72,000
pieces
|
Production Hrs. Annual | 2,008
hrs
|
Location (State) | Texas |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $280,606 | 6,830,598 |
kWh
|
$0.041 |
Electricity Demand | $182,600 | 33,857 |
kW-mo/yr
|
$5.39 |
Natural Gas | $42,058 | 14,573 |
MMBtu
|
$2.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $37,685 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $30,405 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
---|---|---|---|---|---|---|---|
01 | 4.454: Modify startup/shutdown times | $25,130 | - | - | - | $25,130 | |
02 | 3.7198: Reduce / eliminate use of disposable product | $5,910 | $150 | - |
$5,910
-
lb
|
- | |
03 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,285 | $1,400 |
$365
9,672
kWh
|
- | $1,920 | |
04 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,300 | $500 |
$2,300
60,375
kWh
|
- | - | |
05 | 2.7124: Make a practice of turning off lights when not needed | $570 | $150 |
$570
14,947
kWh
|
- | - | |
06 | 2.4221: Install compressor air intakes in coolest locations | $540 | $600 |
$540
14,361
kWh
|
- | - | |
07 | 2.4314: Use synthetic lubricant | $470 | - |
$470
12,309
kWh
|
- | - | |
08 | 2.7124: Make a practice of turning off lights when not needed | $360 | $1,480 |
$360
9,672
kWh
|
- | - | |
09 | 2.7124: Make a practice of turning off lights when not needed | $120 | - |
$120
3,224
kWh
|
- | - | |
TOTAL RECOMMENDED | $37,685 | $4,280 |
$4,725
124,560
kWh
|
$5,910
-
lb
|
$27,050 | ||
TOTAL IMPLEMENTED | $30,405 | $2,050 |
$3,355
88,218
kWh
|
- | $27,050 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs