ITAC Assessment: WI0449
ITAC logo
ITAC Assessment: WI0449
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Aggregate Processing Equipment
NAICS 333131: Mining Machinery and Equipment Manufacturing
SIC 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment
Sales Range $10
M
to 50
M
# of Employees 175
Plant Area 200,000
ft2
Annual Production 150
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $158,170 4,930,726
kWh
Electricity Demand $105,108 10,156
kW-mo/yr
Electricity Fees $30,396 -
Natural Gas $146,343 31,868
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $88,008 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $26,913 $47,600 $16,362
482,664
kWh
$10,551
-
kW-mo/yr
- - -
02 2.4322: Use or replace with energy efficient substitutes $16,417 $29,500 $6,285
185,400
kWh
$10,132
-
kW-mo/yr
- - -
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,045 - - $14,045
-
kW-mo/yr
- - -
04 2.7261: Install timers and/or thermostats $16,308 $2,000 - - $16,308
-
MMBtu
- -
05 3.6112: Use filter and drying oven to reduce sludge volume $5,783 $15,000 - - $(-881.0)
-
MMBtu
$6,664
-
gal
-
06 3.7137: Replace cloth rags with paper towels $5,589 - - - - - $5,589
07 2.4324: Replace hydraulic / pneumatic equipment with electric equipment $2,048 $3,500 $2,048
60,426
kWh
- - - -
08 2.4221: Install compressor air intakes in coolest locations $905 $640 $610
17,995
kWh
- $295
-
MMBtu
- -
TOTAL RECOMMENDED $88,008 $98,240 $25,305
746,485
kWh
$34,728
-
kW-mo/yr
$15,722
-
MMBtu
$6,664
-
gal
$5,589
TOTAL IMPLEMENTED - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs