ITAC Assessment: WI0444
ITAC logo
ITAC Assessment: WI0444
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2003
Principal Product Industrial Machining
NAICS 332710: Machine Shops
SIC 3599: Industrial and Commercial Machinery and Equipment, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 90
Plant Area 36,000
ft2
Annual Production 1,200,000
pieces
Production Hrs. Annual 6,000
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $61,894 1,478,883
kWh
Electricity Demand $27,659 2,811
kW-mo/yr
Electricity Fees $34,693 -
Natural Gas $3,026 478
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,943 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $11,769

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
01 3.6112: Use filter and drying oven to reduce sludge volume $6,597 $9,000 - - $(-283.0)
-
MMBtu
$8,280
-
gal
$(-1,400.0)
02 2.4224: Upgrade controls on compressors $4,807 $7,500 $4,807
108,767
kWh
- - - -
03 2.7142: Utilize higher efficiency lamps and/or ballasts $4,189 $8,655 $2,779
62,874
kWh
$1,410
-
kW-mo/yr
- - -
04 2.2437: Recover waste heat from equipment $3,383 $2,000 - - $3,383
-
MMBtu
- -
05 2.7447: Install vinyl strip / high speed / air curtain doors $2,301 $1,424 - - $2,301
-
MMBtu
- -
06 2.4221: Install compressor air intakes in coolest locations $983 $740 $717
16,223
kWh
$266
-
kW-mo/yr
- - -
07 2.7261: Install timers and/or thermostats $683 $600 - - $683
-
MMBtu
- -
TOTAL RECOMMENDED $22,943 $29,919 $8,303
187,864
kWh
$1,676
-
kW-mo/yr
$6,084
-
MMBtu
$8,280
-
gal
$(-1,400.0)
TOTAL IMPLEMENTED $11,769 $18,395 $3,496
79,097
kWh
$1,676
-
kW-mo/yr
$(-283.0)
-
MMBtu
$8,280
-
gal
$(-1,400.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs