Assessment Year | 2001 |
---|---|
Principal Product | Actuators |
NAICS |
n/a
|
SIC | 3593: Fluid Power Cylinders and Actuators |
Sales Range | $10 M to 50M |
# of Employees | 73 |
Plant Area |
25,600
ft2
|
Annual Production | 9,500
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $18,929 | 579,200 |
kWh
|
$0.033 |
Electricity Demand | $17,455 | 1,692 |
kW-mo/yr
|
$10.32 |
Electricity Fees | $3,124 | - |
|
- |
Natural Gas | $13,341 | 1,579 |
MMBtu
|
$8.45 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $18,682 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $11,890 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 2.6121: Reduce hot water temperature to the minimum required | $5,787 | $4,500 | - | - |
$5,787
-
MMBtu
|
- | - | - | - | - | |
02 | 2.6231: Utilize controls to operate equipment only when needed | $2,749 | $2,000 | - | - |
$2,749
-
MMBtu
|
- | - | - | - | - | |
03 | 3.3131: Use evaporation to concentrate material | $3,585 | $11,000 | - | - |
$(-183.0)
-
MMBtu
|
$4,968
-
gal
|
- | $(-1,200.0) | - | - | |
04 | 3.6192: Use a less expensive method of waste removal | $2,138 | - | - | - | - | - |
$2,138
-
lb
|
- | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,216 | $500 |
$(-32.0)
(-933)
kWh
|
- |
$1,248
-
MMBtu
|
- | - | - | - | - | |
06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,839 | $9,403 |
$1,102
31,939
kWh
|
$737
-
kW-mo/yr
|
- | - | - | - | - | - | |
07 | 3.7137: Replace cloth rags with paper towels | $759 | - | - | - | - | - |
$(-18.0)
-
lb
|
- | $777 | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $340 | $640 |
$208
6,039
kWh
|
$132
-
kW-mo/yr
|
- | - | - | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $269 | $570 |
$104
3,022
kWh
|
$34
-
kW-mo/yr
|
- | - | - | - | - | $131 | |
TOTAL RECOMMENDED | $18,682 | $28,613 |
$1,382
40,067
kWh
|
$903
-
kW-mo/yr
|
$9,601
-
MMBtu
|
$4,968
-
gal
|
$2,120
-
lb
|
$(-1,200.0) | $777 | $131 | ||
TOTAL IMPLEMENTED | $11,890 | $7,000 |
$(-32.0)
(-933)
kWh
|
- |
$9,784
-
MMBtu
|
- |
$2,138
-
lb
|
- | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (non-haz) Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs