| Assessment Year | 2025 |
|---|---|
| Principal Product | Concrete Components |
| NAICS | 327390: Other Concrete Product Manufacturing |
| SIC | 3271: Concrete Block and Brick |
| Sales Range | $10 M to 50M |
| # of Employees | 82 |
| Plant Area |
83,000
ft2
|
| Annual Production | 6,800,000
ton
|
| Production Hrs. Annual | 4,680
hrs
|
| Location (State) | Texas |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $43,979 | 865,200 |
kWh
|
$0.051 | |
| Electricity Demand | $23,306 | 2,398 |
kW-mo/yr
|
$9.72 | |
| Electricity Fees | $10,159 | - |
|
- | |
| Natural Gas | $7,537 | 64 |
MMBtu
|
$117.77 | |
| Waste Disposal Costs | |||||
| Water Usage | $2,500 | 10,176 |
Tgal
|
$0.25 | |
| TOTAL YEARLY COSTS | $87,481 | ||||
| RECOMMENDED SAVINGS* | $53,266 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | - | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,093 | $2,408 |
$609
11,981
kWh
|
$484
-
kW-mo/yr
|
- | |
| 02 | 2.7135: Install occupancy sensors | $146 | $142 |
$146
2,875
kWh
|
- | - | |
| 03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,317 | $5,609 |
$1,553
30,577
kWh
|
$764
-
kW-mo/yr
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $28,561 | - |
$19,148
376,924
kWh
|
$9,413
-
kW-mo/yr
|
- | |
| 05 | 2.7221: Lower temperature during the winter season and vice-versa | $1,625 | $603 |
$1,625
31,984
kWh
|
- | - | |
| 06 | 2.8121: Apply for tax-free status for energy purchases | $19,525 | $5,000 | - | - | $19,525 | |
| TOTAL RECOMMENDED | $53,266 | $13,762 |
$23,080
454,340
kWh
|
$10,661
-
kW-mo/yr
|
$19,525 | ||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs