ITAC Assessment: NT0042
ITAC logo
ITAC Assessment: NT0042
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2025
Principal Product Concrete Components
NAICS 327390: Other Concrete Product Manufacturing
SIC 3271: Concrete Block and Brick
Sales Range $10
M
to 50
M
# of Employees 82
Plant Area 83,000
ft2
Annual Production 6,800,000
ton
Production Hrs. Annual 4,680
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $43,979 865,200
kWh
Electricity Demand $23,306 2,398
kW-mo/yr
Electricity Fees $10,159 -
Natural Gas $7,537 64
MMBtu
Waste Disposal Costs
Water Usage $2,500 10,176
Tgal
TOTAL YEARLY COSTS $87,481
RECOMMENDED SAVINGS* $38,623 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $1,093 $2,408 $609
11,981
kWh
$484
-
kW-mo/yr
-
02 2.7135: Install occupancy sensors $146 $142 $146
2,875
kWh
- -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,317 $5,609 $1,553
30,577
kWh
$764
-
kW-mo/yr
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $28,561 - $19,148
376,924
kWh
$9,413
-
kW-mo/yr
-
05 2.7221: Lower temperature during the winter season and vice-versa $1,625 - $1,625
31,984
kWh
- -
06 2.8121: Apply for tax-free status for energy purchases $4,881 $5,000 - - $4,881
TOTAL RECOMMENDED $38,623 $13,159 $23,080
454,340
kWh
$10,661
-
kW-mo/yr
$4,881
TOTAL IMPLEMENTED - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs