Assessment Year | 2008 |
---|---|
Principal Product | Hot-packed juices |
NAICS | 312111: Soft Drink Manufacturing |
SIC | 2086: Bottled and Canned Soft Drinks and Carbonated Waters |
Sales Range | $5 M to 10M |
# of Employees | 110 |
Plant Area |
200,000
ft2
|
Annual Production | 4,500,000
units
|
Production Hrs. Annual | 7,488
hrs
|
Location (State) | Alabama |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $385,995 | 7,380,900 |
kWh
|
$0.052 |
Electricity Demand | $83,977 | 17,537 |
kW-mo/yr
|
$4.79 |
Electricity Fees | $37,266 | - |
|
- |
Natural Gas | $519,508 | 46,806 |
MMBtu
|
$11.10 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $90,333 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $19,936 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
---|---|---|---|---|---|---|---|
01 | 2.4224: Upgrade controls on compressors | $12,169 | $6,000 |
$12,169
251,689
kWh
|
- | - | |
02 | 2.4239: Eliminate or reduce compressed air usage | $2,811 | $2,000 |
$2,609
53,964
kWh
|
$202
-
kW-mo/yr
|
- | |
03 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,288 | $3,000 |
$2,288
47,332
kWh
|
- | - | |
04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $8,835 | - |
$8,835
182,733
kWh
|
- | - | |
05 | 2.2414: Use waste heat from hot flue gases to preheat | $14,804 | $8,000 | - | - |
$14,804
-
MMBtu
|
|
06 | 2.2136: Install / repair insulation on steam lines | $4,292 | $2,550 | - | - |
$4,292
-
MMBtu
|
|
07 | 2.2135: Repair and eliminate steam leaks | $6,002 | $986 | - | - |
$6,002
-
MMBtu
|
|
08 | 2.7135: Install occupancy sensors | $278 | $271 |
$278
4,810
kWh
|
- | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $21,436 | $49,534 |
$18,500
382,641
kWh
|
$2,936
-
kW-mo/yr
|
- | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,186 | $1,050 |
$1,884
38,971
kWh
|
$302
-
kW-mo/yr
|
- | |
11 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $13,899 | $37,307 |
$11,993
248,051
kWh
|
$1,906
-
kW-mo/yr
|
- | |
12 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,333 | $4,911 |
$1,151
23,827
kWh
|
$182
-
kW-mo/yr
|
- | |
TOTAL RECOMMENDED | $90,333 | $115,609 |
$59,707
1,234,018
kWh
|
$5,528
-
kW-mo/yr
|
$25,098
-
MMBtu
|
||
TOTAL IMPLEMENTED | $19,936 | $5,986 |
$13,732
284,029
kWh
|
$202
-
kW-mo/yr
|
$6,002
-
MMBtu
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs