ITAC Assessment: WI0384
ITAC logo
ITAC Assessment: WI0384
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2000
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 215
Plant Area 128,000
ft2
Annual Production 1,000,000
pieces
Production Hrs. Annual 6,480
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $298,877 8,180,246
kWh
Electricity Demand $256,251 18,267
kW-mo/yr
Electricity Fees $17,275 -
Natural Gas $91,931 26,064
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $198,948 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
01 4.126: Install sensors to detect defects $141,912 $70,000 - - - $141,912
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $18,107 $20,000 $35,269
918,523
kWh
$19,779
-
kW-mo/yr
$(-36,941.0)
-
MMBtu
-
03 2.2437: Recover waste heat from equipment $17,119 $6,500 - - $17,119
-
MMBtu
-
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $9,935 $3,250 $8,709
226,846
kWh
$4,640
-
kW-mo/yr
$(-3,414.0)
-
MMBtu
-
05 2.7261: Install timers and/or thermostats $5,952 $1,000 - - $5,952
-
MMBtu
-
06 2.4221: Install compressor air intakes in coolest locations $2,745 $640 $1,824
47,479
kWh
$921
-
kW-mo/yr
- -
07 2.7447: Install vinyl strip / high speed / air curtain doors $1,623 $1,033 - - $1,623
-
MMBtu
-
08 2.2511: Insulate bare equipment $1,185 $427 $774
20,223
kWh
$411
-
kW-mo/yr
- -
09 2.2515: Use optimum thickness insulation $370 $375 - - $370
-
MMBtu
-
TOTAL RECOMMENDED $198,948 $103,225 $46,576
1,213,071
kWh
$25,751
-
kW-mo/yr
$(-15,291.0)
-
MMBtu
$141,912
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs