ITAC Assessment: WI0329
ITAC logo
ITAC Assessment: WI0329
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Slurry Pumps
NAICS
n/a
SIC 3561: Pumps and Pumping Equipment
Sales Range $10
M
to 50
M
# of Employees 150
Plant Area 77,000
ft2
Annual Production 1,440
pieces
Production Hrs. Annual 6,480
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $82,468 2,787,222
kWh
Electricity Demand $78,305 11,043
kW-mo/yr
Electricity Fees $10,036 -
Natural Gas $33,748 7,012
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $56,238 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $38,962

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $22,908 $1,500 - - - - - - - $22,908
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $14,336 - - $14,808
-
kW-mo/yr
- - - $(-472.0) - -
03 2.3132: Recharge batteries on during off-peak demand periods $1,092 $400 - $1,092
-
kW-mo/yr
- - - - - -
04 3.8142: Distill contaminated solvents for reuse $10,231 $11,400 - - - $12,472
-
gal
$(-542.0)
-
lb
$(-1,119.0) - $(-580.0)
05 4.231: Purchase equipment instead of leasing $3,600 $9,500 - - - - - - $3,600 -
06 2.7261: Install timers and/or thermostats $3,445 $1,600 - - $3,445
-
MMBtu
- - - - -
07 2.4221: Install compressor air intakes in coolest locations $626 $640 $470
14,947
kWh
$156
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $56,238 $25,040 $470
14,947
kWh
$16,056
-
kW-mo/yr
$3,445
-
MMBtu
$12,472
-
gal
$(-542.0)
-
lb
$(-1,591.0) $3,600 $22,328
TOTAL IMPLEMENTED $38,962 $2,540 $470
14,947
kWh
$16,056
-
kW-mo/yr
- - - $(-472.0) - $22,908
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs