ITAC Assessment: WI0328
ITAC logo
ITAC Assessment: WI0328
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1998
Principal Product Injection Molded Plastics
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $5
M
to 10
M
# of Employees 75
Plant Area 37,900
ft2
Annual Production 0
units
Production Hrs. Annual 6,600
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $95,894 2,693,435
kWh
Electricity Demand $84,608 6,870
kW-mo/yr
Electricity Fees $3,695 -
Natural Gas $16,411 3,290
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $29,741 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $19,357

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
01 4.521: Clear and rent existing space $18,977 - - - - - $18,977
02 4.111: Add equipment/ operators to reduce production bottleneck $3,491 $1,250 - - - $3,491 -
03 2.8113: Purchase gas directly from a contract gas supplier $3,047 $500 - - - - $3,047
04 2.2511: Insulate bare equipment $1,883 $285 $1,276
33,998
kWh
$607
-
kW-mo/yr
- - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $950 $712 - - $950
-
MMBtu
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $287 $820 - - $287
-
MMBtu
- -
07 2.7261: Install timers and/or thermostats $726 $200 - - $726
-
MMBtu
- -
08 2.4221: Install compressor air intakes in coolest locations $380 $840 $237
6,448
kWh
$143
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $29,741 $4,607 $1,513
40,446
kWh
$750
-
kW-mo/yr
$1,963
-
MMBtu
$3,491 $22,024
TOTAL IMPLEMENTED $19,357 $840 $237
6,448
kWh
$143
-
kW-mo/yr
- - $18,977
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs