ITAC Assessment: WI0300
ITAC logo
ITAC Assessment: WI0300
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Molded and non-molded chemical products
NAICS
n/a
SIC 2899: Chemicals and Chemical Preparations, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 122
Plant Area 85,000
ft2
Annual Production 67,000,000
pieces
Production Hrs. Annual 3,550
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,527 1,321,805
kWh
Electricity Demand $52,736 4,257
kW-mo/yr
Electricity Fees $2,007 -
Natural Gas $75,846 18,319
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $90,093 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $66,700

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
01 4.445: Install equipment to move product $61,113 $30,000 $(-356.0)
(-7,327)
kWh
$(-406.0)
-
kW-mo/yr
- - - - $61,875 -
02 3.4114: Replace city water with recycled water via cooling tower $11,999 $17,000 $(-953.0)
(-19,930)
kWh
$(-689.0)
-
kW-mo/yr
$8,557
-
MMBtu
$5,084
-
Tgal
- - - -
03 3.8142: Distill contaminated solvents for reuse $5,148 $17,000 - - - - $4,980
-
gal
$(-181.0)
-
lb
$(-938.0) $1,287
04 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,810 $90 $1,632
33,998
kWh
$1,178
-
kW-mo/yr
- - - - - -
05 2.4221: Install compressor air intakes in coolest locations $606 $640 $352
7,327
kWh
$254
-
kW-mo/yr
- - - - - -
06 2.6218: Turn off equipment when not in use $2,192 - - - $2,192
-
MMBtu
- - - - -
07 2.7261: Install timers and/or thermostats $1,932 $400 - - $1,932
-
MMBtu
- - - - -
08 2.1233: Analyze flue gas for proper air/fuel ratio $1,355 $500 - - $1,355
-
MMBtu
- - - - -
09 2.7447: Install vinyl strip / high speed / air curtain doors $1,241 $2,739 - - $1,241
-
MMBtu
- - - - -
10 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,112 $5,000 $1,112
23,154
kWh
- - - - - - -
11 2.3132: Recharge batteries on during off-peak demand periods $585 - - $585
-
kW-mo/yr
- - - - - -
TOTAL RECOMMENDED $90,093 $73,369 $1,787
37,222
kWh
$922
-
kW-mo/yr
$15,277
-
MMBtu
$5,084
-
Tgal
$4,980
-
gal
$(-181.0)
-
lb
$60,937 $1,287
TOTAL IMPLEMENTED $66,700 $30,090 $1,276
26,671
kWh
$1,357
-
kW-mo/yr
$2,192
-
MMBtu
- - - $61,875 -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs