ITAC Assessment: IC0114
ITAC logo
ITAC Assessment: IC0114
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2006
Principal Product recycled paper board
NAICS 322130: Paperboard Mills
SIC 2631: Paperboard Mills
Sales Range $10
M
to 50
M
# of Employees 45
Plant Area 35,000
ft2
Annual Production 38,000
ton
Production Hrs. Annual 8,472
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $356,657 12,011,400
kWh
Electricity Demand $44,847 20,210
kW-mo/yr
Electricity Fees $28,768 -
Natural Gas $1,549,017 187,545
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $469,098 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $39,197

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
01 2.1222: Install turbulators $42,000 $7,500 - - $42,000
-
MMBtu
-
02 2.5111: Convert from indirect to direct fired systems $16,000 $84,000 - - $16,000
-
MMBtu
-
03 2.1242: Minimize boiler blowdown with better feedwater treatment $19,000 $63,000 - - $19,000
-
MMBtu
-
04 2.5111: Convert from indirect to direct fired systems $175,000 $120,400 - - $175,000
-
MMBtu
-
05 2.2437: Recover waste heat from equipment $8,400 $16,800 - - $8,400
-
MMBtu
-
06 2.6231: Utilize controls to operate equipment only when needed $4,216 $5,280 - - $4,123
-
MMBtu
$93
-
Tgal
07 2.2443: Re-use or recycle hot or cold process exhaust air $93,057 $456,000 - - $93,057
-
MMBtu
-
08 2.2443: Re-use or recycle hot or cold process exhaust air $91,228 $834,000 - - $91,228
-
MMBtu
-
09 2.4133: Use most efficient type of electric motors $10,414 $65,273 $9,265
308,922
kWh
$1,149
-
kW-mo/yr
- -
10 2.1243: Use heat from boiler blowdown to preheat boiler feed water $2,000 $8,400 - - $1,000
-
MMBtu
$1,000
-
Tgal
11 2.2136: Install / repair insulation on steam lines $4,400 $1,200 - - $4,400
-
MMBtu
-
12 2.2135: Repair and eliminate steam leaks $2,000 $2,800 - - $2,000
-
MMBtu
-
13 2.7142: Utilize higher efficiency lamps and/or ballasts $1,383 $9,400 $1,226
40,868
kWh
$157
-
kW-mo/yr
- -
TOTAL RECOMMENDED $469,098 $1,674,053 $10,491
349,790
kWh
$1,306
-
kW-mo/yr
$456,208
-
MMBtu
$1,093
-
Tgal
TOTAL IMPLEMENTED $39,197 $150,073 $10,491
349,790
kWh
$1,306
-
kW-mo/yr
$26,400
-
MMBtu
$1,000
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs