ITAC Assessment: AM0297
ITAC logo
ITAC Assessment: AM0297
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Steel fabrication, structural steel baseplates for gas turbi
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 265
Plant Area 172,200
ft2
Annual Production 7,204
pieces
Production Hrs. Annual 3,298
hrs
Location (State) Texas

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $258,792 4,229,191
kWh
Electricity Demand $60,713 20,430
kW-mo/yr
Electricity Fees $2,423 -
Natural Gas $4,358 950
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $136,350 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $88,290

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
01 2.8114: Change rate schedules or other changes in utility service $64,000 - - - $64,000 - - -
02 3.8142: Distill contaminated solvents for reuse $40,000 $24,270 - - - $40,000
-
gal
- -
03 2.3212: Optimize plant power factor $21,900 $22,340 - $21,900
-
kW-mo/yr
- - - -
04 3.7198: Reduce / eliminate use of disposable product $4,960 $110 - - - - $4,960
-
lb
-
05 2.3512: De-energize excess transformer capacity $2,070 $300 $1,800
35,756
kWh
$270
-
kW-mo/yr
- - - -
06 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,880 $300 $1,880
38,101
kWh
- - - - -
07 4.423: Move product using mechanical means $770 $1,460 - - - - - $770
08 2.8123: Pay utility bills on time $510 - - - $510 - - -
09 2.6212: Turn off equipment during breaks, reduce operating time $260 - $260
5,275
kWh
- - - - -
TOTAL RECOMMENDED $136,350 $48,780 $3,940
79,132
kWh
$22,170
-
kW-mo/yr
$64,510 $40,000
-
gal
$4,960
-
lb
$770
TOTAL IMPLEMENTED $88,290 $22,640 $1,880
38,101
kWh
$21,900
-
kW-mo/yr
$64,510 - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Other Liquid (haz) Savings Solid Waste (non-haz) Savings Personnel Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs