| Assessment Year | 1986 |
|---|---|
| Principal Product | OILS & GREASES (BLENDING) |
| NAICS |
n/a
|
| SIC | 2992: Lubricating Oils and Greases |
| Sales Range | $50 M to 100M |
| # of Employees | 200 |
| Plant Area |
n/a
|
| Annual Production | 168,000
bbl
|
| Production Hrs. Annual | 0
hrs
|
| Location (State) | Oklahoma |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $146,361 | 2,413,540 |
kWh
|
$0.061 |
| Natural Gas | $252,609 | 65,545 |
MMBtu
|
$3.85 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $44,861 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | $13,281 | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $4,573 | $2,082 |
$4,573
68,288
kWh
|
- | |
| 02 | 2.7221: Lower temperature during the winter season and vice-versa | $3,617 | - | - |
$3,617
-
MMBtu
|
|
| 03 | 2.7261: Install timers and/or thermostats | $4,105 | $5,300 | - |
$4,105
-
MMBtu
|
|
| 04 | 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat | $16,774 | $35,620 |
$20,499
318,288
kWh
|
$(-3,725.0)
-
MMBtu
|
|
| 05 | 2.2414: Use waste heat from hot flue gases to preheat | $5,672 | $21,000 | - |
$5,672
-
MMBtu
|
|
| 06 | 2.2124: Install de-aerator in place of condensate tank | $6,444 | $30,000 | - |
$6,444
-
MMBtu
|
|
| 07 | 2.2122: Install / repair insulation on condensate lines | $986 | $2,550 | - |
$986
-
MMBtu
|
|
| 08 | 2.2514: Cover open tanks | $2,690 | $533 | - |
$2,690
-
MMBtu
|
|
| TOTAL RECOMMENDED | $44,861 | $97,085 |
$25,072
386,576
kWh
|
$19,789
-
MMBtu
|
||
| TOTAL IMPLEMENTED | $13,281 | $9,932 |
$4,573
68,288
kWh
|
$8,708
-
MMBtu
|
||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs