ITAC Assessment: OK0189
ITAC logo
ITAC Assessment: OK0189
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1986
Principal Product OILS & GREASES (BLENDING)
NAICS
n/a
SIC 2992: Lubricating Oils and Greases
Sales Range $50
M
to 100
M
# of Employees 200
Plant Area
n/a
Annual Production 168,000
bbl
Production Hrs. Annual 0
hrs
Location (State) Oklahoma

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $146,361 2,413,540
kWh
Natural Gas $252,609 65,545
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $44,861 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $13,281

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $4,573 $2,082 $4,573
68,288
kWh
-
02 2.7221: Lower temperature during the winter season and vice-versa $3,617 - - $3,617
-
MMBtu
03 2.7261: Install timers and/or thermostats $4,105 $5,300 - $4,105
-
MMBtu
04 2.3413: Burn fossil fuel to produce steam to drive a steam turbine-generator and use steam exhaust for heat $16,774 $35,620 $20,499
318,288
kWh
$(-3,725.0)
-
MMBtu
05 2.2414: Use waste heat from hot flue gases to preheat $5,672 $21,000 - $5,672
-
MMBtu
06 2.2124: Install de-aerator in place of condensate tank $6,444 $30,000 - $6,444
-
MMBtu
07 2.2122: Install / repair insulation on condensate lines $986 $2,550 - $986
-
MMBtu
08 2.2514: Cover open tanks $2,690 $533 - $2,690
-
MMBtu
TOTAL RECOMMENDED $44,861 $97,085 $25,072
386,576
kWh
$19,789
-
MMBtu
TOTAL IMPLEMENTED $13,281 $9,932 $4,573
68,288
kWh
$8,708
-
MMBtu
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs