ITAC Assessment: WI0293
ITAC logo
ITAC Assessment: WI0293
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1997
Principal Product Aerial Lift Trucks
NAICS
n/a
SIC 3441: Fabricated Structural Metal
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 96,000
ft2
Annual Production 2,500
pieces
Production Hrs. Annual 4,250
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $57,173 2,024,912
kWh
Electricity Demand $47,629 5,443
kW-mo/yr
Electricity Fees $1,100 -
Natural Gas $85,936 18,422
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $128,503 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
01 3.2123: Convert to high volume low pressure (hvlp) paint guns $47,846 $2,000 n/a - - - - - - - $47,846
02 2.7314: Reduce ventilation air $16,800 $4,000 n/a $1,469
49,238
kWh
- $15,331
-
MMBtu
- - - - -
03 2.7261: Install timers and/or thermostats $15,816 $1,400 n/a - - $15,816
-
MMBtu
- - - - -
04 2.8113: Purchase gas directly from a contract gas supplier $13,037 $500 n/a - - - - - - $13,037 -
05 2.7447: Install vinyl strip / high speed / air curtain doors $10,025 $3,544 n/a - - $10,025
-
MMBtu
- - - - -
06 3.8122: Use tight-fitting lids on material containers to reduce voc emissions $7,350 $4,000 n/a - - - - - $6,000 - $1,350
07 2.8121: Apply for tax-free status for energy purchases $5,404 - n/a - - - - - - $5,404 -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,600 - n/a - - - - $3,600
-
lb
- - -
09 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,450 $180 n/a $1,478
49,531
kWh
$972
-
kW-mo/yr
- - - - - -
10 2.4221: Install compressor air intakes in coolest locations $626 $1,280 n/a $349
11,723
kWh
$277
-
kW-mo/yr
- - - - - -
11 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $1,976 $8,000 n/a $597
19,930
kWh
$1,379
-
kW-mo/yr
- - - - - -
12 3.4151: Minimize water usage $1,853 - n/a - - - $1,853
-
Tgal
- - - -
13 4.821: Pay bills on time to avoid late fees $1,412 - n/a - - - - - - $1,412 -
14 2.7135: Install occupancy sensors $308 $225 n/a $308
10,258
kWh
- - - - - - -
TOTAL RECOMMENDED $128,503 $25,129 $4,201
140,680
kWh
$2,628
-
kW-mo/yr
$41,172
-
MMBtu
$1,853
-
Tgal
$3,600
-
lb
$6,000 $19,853 $49,196
TOTAL IMPLEMENTED - - - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Solid Waste (non-haz) Savings Personnel Changes Savings Administrative Changes Savings Primary Raw Material Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs