Assessment Year | 1997 |
---|---|
Principal Product | Aerial Lift Trucks |
NAICS |
n/a
|
SIC | 3441: Fabricated Structural Metal |
Sales Range | $10 M to 50M |
# of Employees | 200 |
Plant Area |
96,000
ft2
|
Annual Production | 2,500
pieces
|
Production Hrs. Annual | 4,250
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $57,173 | 2,024,912 |
kWh
|
$0.028 |
Electricity Demand | $47,629 | 5,443 |
kW-mo/yr
|
$8.75 |
Electricity Fees | $1,100 | - |
|
- |
Natural Gas | $85,936 | 18,422 |
MMBtu
|
$4.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $128,503 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | - |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $47,846 | $2,000 | n/a | - | - | - | - | - | - | - | $47,846 |
02 | 2.7314: Reduce ventilation air | $16,800 | $4,000 | n/a |
$1,469
49,238
kWh
|
- |
$15,331
-
MMBtu
|
- | - | - | - | - |
03 | 2.7261: Install timers and/or thermostats | $15,816 | $1,400 | n/a | - | - |
$15,816
-
MMBtu
|
- | - | - | - | - |
04 | 2.8113: Purchase gas directly from a contract gas supplier | $13,037 | $500 | n/a | - | - | - | - | - | - | $13,037 | - |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $10,025 | $3,544 | n/a | - | - |
$10,025
-
MMBtu
|
- | - | - | - | - |
06 | 3.8122: Use tight-fitting lids on material containers to reduce voc emissions | $7,350 | $4,000 | n/a | - | - | - | - | - | $6,000 | - | $1,350 |
07 | 2.8121: Apply for tax-free status for energy purchases | $5,404 | - | n/a | - | - | - | - | - | - | $5,404 | - |
08 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,600 | - | n/a | - | - | - | - |
$3,600
-
lb
|
- | - | - |
09 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,450 | $180 | n/a |
$1,478
49,531
kWh
|
$972
-
kW-mo/yr
|
- | - | - | - | - | - |
10 | 2.4221: Install compressor air intakes in coolest locations | $626 | $1,280 | n/a |
$349
11,723
kWh
|
$277
-
kW-mo/yr
|
- | - | - | - | - | - |
11 | 2.4146: Use adjustable frequency drive or multiple speed motors on existing system | $1,976 | $8,000 | n/a |
$597
19,930
kWh
|
$1,379
-
kW-mo/yr
|
- | - | - | - | - | - |
12 | 3.4151: Minimize water usage | $1,853 | - | n/a | - | - | - |
$1,853
-
Tgal
|
- | - | - | - |
13 | 4.821: Pay bills on time to avoid late fees | $1,412 | - | n/a | - | - | - | - | - | - | $1,412 | - |
14 | 2.7135: Install occupancy sensors | $308 | $225 | n/a |
$308
10,258
kWh
|
- | - | - | - | - | - | - |
TOTAL RECOMMENDED | $128,503 | $25,129 |
$4,201
140,680
kWh
|
$2,628
-
kW-mo/yr
|
$41,172
-
MMBtu
|
$1,853
-
Tgal
|
$3,600
-
lb
|
$6,000 | $19,853 | $49,196 | ||
TOTAL IMPLEMENTED | - | - | - | - | - | - | - | - | - | - | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs