Assessment Year | 2005 |
---|---|
Principal Product | Military Aircrafts |
NAICS | 336411: Aircraft Manufacturing |
SIC | 3721: Aircraft |
Sales Range | $10 M to 50M |
# of Employees | 277 |
Plant Area |
192,534
ft2
|
Annual Production | 1
units
|
Production Hrs. Annual | 3,952
hrs
|
Location (State) | Florida |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $179,171 | 3,279,329 |
kWh
|
$0.055 |
Electricity Demand | $58,225 | 7,669 |
kW-mo/yr
|
$7.59 |
LPG | $125,092 | 4,355 |
MMBtu
|
$28.72 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $317,500 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $246,094 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Increase in Production Savings |
---|---|---|---|---|---|---|---|---|
01 | 2.7292: Lower ceiling to reduce conditioned space | $6,120 | $978 | - | - |
$6,120
-
MMBtu
|
- | |
02 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,368 | $650 |
$2,368
41,541
kWh
|
- | - | - | |
03 | 2.7141: Lower light fixtures in high ceiling areas | $6,271 | $1,680 |
$3,920
103,168
kWh
|
$2,351
-
kW-mo/yr
|
- | - | |
04 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,453 | $675 |
$1,533
40,335
kWh
|
$920
-
kW-mo/yr
|
- | - | |
05 | 2.7135: Install occupancy sensors | $2,952 | $4,688 |
$2,952
77,685
kWh
|
- | - | - | |
06 | 2.7226: Use computer programs to optimize hvac performance | $7,254 | $20,000 |
$3,631
95,550
kWh
|
$3,623
-
kW-mo/yr
|
- | - | |
07 | 2.4221: Install compressor air intakes in coolest locations | $18,424 | - |
$18,424
484,831
kWh
|
- | - | - | |
08 | 2.7124: Make a practice of turning off lights when not needed | $3,385 | - |
$3,385
89,076
kWh
|
- | - | - | |
09 | 2.7292: Lower ceiling to reduce conditioned space | $5,477 | $800 | - | - |
$5,477
-
MMBtu
|
- | |
10 | 2.5194: Redesign process | $61,200 | $1,000,000 | - | - |
$61,200
-
MMBtu
|
- | |
11 | 4.424: Improve space comfort conditioning | $1,596 | $26,800 |
$911
23,970
kWh
|
$685
-
kW-mo/yr
|
- | - | |
12 | 4.514: Re-arrange equipment layout to reduce handling costs | $100,000 | $25,000 | - | - | - | $100,000 | |
13 | 4.424: Improve space comfort conditioning | $100,000 | $50,000 | - | - | - | $100,000 | |
TOTAL RECOMMENDED | $317,500 | $1,131,271 |
$37,124
956,156
kWh
|
$7,579
-
kW-mo/yr
|
$72,797
-
MMBtu
|
$200,000 | ||
TOTAL IMPLEMENTED | $246,094 | $106,583 |
$30,541
782,921
kWh
|
$3,956
-
kW-mo/yr
|
$11,597
-
MMBtu
|
$200,000 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | LPG Savings | Increase in Production Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs