ITAC Assessment: UF0371
ITAC logo
ITAC Assessment: UF0371
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2005
Principal Product Military Aircrafts
NAICS 336411: Aircraft Manufacturing
SIC 3721: Aircraft
Sales Range $10
M
to 50
M
# of Employees 277
Plant Area 192,534
ft2
Annual Production 1
units
Production Hrs. Annual 3,952
hrs
Location (State) Florida

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $179,171 3,279,329
kWh
Electricity Demand $58,225 7,669
kW-mo/yr
LPG $125,092 4,355
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $317,500 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $246,094

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings LPG Savings Increase in Production Savings
01 2.7292: Lower ceiling to reduce conditioned space $6,120 $978 - - $6,120
-
MMBtu
-
02 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,368 $650 $2,368
41,541
kWh
- - -
03 2.7141: Lower light fixtures in high ceiling areas $6,271 $1,680 $3,920
103,168
kWh
$2,351
-
kW-mo/yr
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $2,453 $675 $1,533
40,335
kWh
$920
-
kW-mo/yr
- -
05 2.7135: Install occupancy sensors $2,952 $4,688 $2,952
77,685
kWh
- - -
06 2.7226: Use computer programs to optimize hvac performance $7,254 $20,000 $3,631
95,550
kWh
$3,623
-
kW-mo/yr
- -
07 2.4221: Install compressor air intakes in coolest locations $18,424 - $18,424
484,831
kWh
- - -
08 2.7124: Make a practice of turning off lights when not needed $3,385 - $3,385
89,076
kWh
- - -
09 2.7292: Lower ceiling to reduce conditioned space $5,477 $800 - - $5,477
-
MMBtu
-
10 2.5194: Redesign process $61,200 $1,000,000 - - $61,200
-
MMBtu
-
11 4.424: Improve space comfort conditioning $1,596 $26,800 $911
23,970
kWh
$685
-
kW-mo/yr
- -
12 4.514: Re-arrange equipment layout to reduce handling costs $100,000 $25,000 - - - $100,000
13 4.424: Improve space comfort conditioning $100,000 $50,000 - - - $100,000
TOTAL RECOMMENDED $317,500 $1,131,271 $37,124
956,156
kWh
$7,579
-
kW-mo/yr
$72,797
-
MMBtu
$200,000
TOTAL IMPLEMENTED $246,094 $106,583 $30,541
782,921
kWh
$3,956
-
kW-mo/yr
$11,597
-
MMBtu
$200,000
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings LPG Savings Increase in Production Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs