Assessment Year | 1997 |
---|---|
Principal Product | Packaging Paper and Film |
NAICS |
n/a
|
SIC | 2571: |
Sales Range | $10 M to 50M |
# of Employees | 180 |
Plant Area |
114,750
ft2
|
Annual Production | 25,200,000
lb
|
Production Hrs. Annual | 8,400
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $345,751 | 9,726,553 |
kWh
|
$0.036 |
Electricity Demand | $283,333 | 22,049 |
kW-mo/yr
|
$12.85 |
Electricity Fees | $39,508 | - |
|
- |
Natural Gas | $293,610 | 90,175 |
MMBtu
|
$3.26 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $63,993 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $35,780 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|---|---|---|---|
01 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $17,900 | - | - | - | - | - |
$17,900
-
lb
|
- | - | - | - | |
02 | 4.212: Adopt in-house material generation | $12,690 | - | - | - | - | - | - | - | - | $12,690 | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $12,496 | $11,150 |
$(-349.0)
(-9,379)
kWh
|
- |
$12,845
-
MMBtu
|
- | - | - | - | - | - | |
04 | 2.2621: Modify refrigeration system to operate at a lower pressure | $7,349 | $22,000 |
$2,025
54,220
kWh
|
$5,324
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
05 | 2.7251: Reduce air conditioning load by evaporating water from roof | $6,780 | $34,425 |
$4,744
126,905
kWh
|
$5,359
-
kW-mo/yr
|
- |
$(-3,323.0)
-
Tgal
|
- | - | - | - | - | |
06 | 3.8142: Distill contaminated solvents for reuse | $1,430 | - | - | - | - | - | - | $(-3,000.0) | $(-200.0) | - | $4,630 | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $2,219 | $150 |
$1,599
42,790
kWh
|
$620
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $1,588 | $640 |
$1,020
27,257
kWh
|
$568
-
kW-mo/yr
|
- | - | - | - | - | - | - | |
09 | 2.3132: Recharge batteries on during off-peak demand periods | $1,541 | $5,000 | - |
$973
-
kW-mo/yr
|
- | - | - | - | $568 | - | - | |
TOTAL RECOMMENDED | $63,993 | $73,365 |
$9,039
241,793
kWh
|
$12,844
-
kW-mo/yr
|
$12,845
-
MMBtu
|
$(-3,323.0)
-
Tgal
|
$17,900
-
lb
|
$(-3,000.0) | $368 | $12,690 | $4,630 | ||
TOTAL IMPLEMENTED | $35,780 | $5,150 |
$1,599
42,790
kWh
|
$1,593
-
kW-mo/yr
|
- | - |
$17,900
-
lb
|
$(-3,000.0) | $368 | $12,690 | $4,630 | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Water Disposal Savings | Solid Waste (non-haz) Savings | Personnel Changes Savings | Administrative Changes Savings | Primary Raw Material Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs