ITAC Assessment: WM0098
ITAC logo
ITAC Assessment: WM0098
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2016
Principal Product Treatment of Wastewater
NAICS 221320: Sewage Treatment Facilities
SIC 4952: Sewerage Systems
Sales Range $10
M
to 50
M
# of Employees 11
Plant Area 196,020
ft2
Annual Production 1,100,000
units
Production Hrs. Annual 8,760
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $398,678 7,398,639
kWh
Electricity Demand $119,950 13,948
kW-mo/yr
Electricity Fees $(-33,005.0) -
Natural Gas $36,186 7,348
MMBtu
Waste Disposal Costs
Water Usage $22,808 39,030,000
Tgal
TOTAL YEARLY COSTS $544,617
RECOMMENDED SAVINGS* $46,893 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $36,988

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings
01 2.4314: Use synthetic lubricant $31,522 $56 $24,968
462,359
kWh
$6,554
-
kW-mo/yr
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $2,985 $6,397 $1,689
31,440
kWh
$1,296
-
kW-mo/yr
- - -
03 2.2414: Use waste heat from hot flue gases to preheat $3,494 $4,661 - - - $3,494
-
MMBtu
-
04 2.4231: Reduce the pressure of compressed air to the minimum required $2,481 - $2,020
37,498
kWh
$461
-
kW-mo/yr
- - -
05 2.2437: Recover waste heat from equipment $1,011 $1,000 - - - $1,011
-
MMBtu
-
06 3.4116: Meter recycled water (to reduce sewer charges) $2,334 - - - - - $2,334
07 2.3131: Reschedule plant operations or reduce load to avoid peaks $2,178 - - - $2,178 - -
08 2.2437: Recover waste heat from equipment $888 $1,140 - - - $888
-
MMBtu
-
TOTAL RECOMMENDED $46,893 $13,254 $28,677
531,297
kWh
$8,311
-
kW-mo/yr
$2,178 $5,393
-
MMBtu
$2,334
TOTAL IMPLEMENTED $36,988 $6,453 $28,677
531,297
kWh
$8,311
-
kW-mo/yr
- - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings One-time Revenue or Avoided Cost Savings