| Assessment Year | 2016 |
|---|---|
| Principal Product | Treatment of Wastewater |
| NAICS | 221320: Sewage Treatment Facilities |
| SIC | 4952: Sewerage Systems |
| Sales Range | $10 M to 50M |
| # of Employees | 11 |
| Plant Area |
196,020
ft2
|
| Annual Production | 1,100,000
units
|
| Production Hrs. Annual | 8,760
hrs
|
| Location (State) | Wisconsin |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | ||
|---|---|---|---|---|---|
| Electricity Usage | $398,678 | 7,398,639 |
kWh
|
$0.054 | |
| Electricity Demand | $119,950 | 13,948 |
kW-mo/yr
|
$8.60 | |
| Electricity Fees | $(-33,005.0) | - |
|
- | |
| Natural Gas | $36,186 | 7,348 |
MMBtu
|
$4.92 | |
| Waste Disposal Costs | |||||
| Water Usage | $22,808 | 39,030,000 |
Tgal
|
$0.001 | |
| TOTAL YEARLY COSTS | $544,617 | ||||
| RECOMMENDED SAVINGS* | $46,893 |
See individual recommendations below
*Non-energy impacts included in savings.
|
|||
| IMPLEMENTED SAVINGS* | $36,988 | ||||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings |
|---|---|---|---|---|---|---|---|---|---|
| 01 | 2.4314: Use synthetic lubricant | $31,522 | $56 |
$24,968
462,359
kWh
|
$6,554
-
kW-mo/yr
|
- | - | - | |
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $2,985 | $6,397 |
$1,689
31,440
kWh
|
$1,296
-
kW-mo/yr
|
- | - | - | |
| 03 | 2.2414: Use waste heat from hot flue gases to preheat | $3,494 | $4,661 | - | - | - |
$3,494
-
MMBtu
|
- | |
| 04 | 2.4231: Reduce the pressure of compressed air to the minimum required | $2,481 | - |
$2,020
37,498
kWh
|
$461
-
kW-mo/yr
|
- | - | - | |
| 05 | 2.2437: Recover waste heat from equipment | $1,011 | $1,000 | - | - | - |
$1,011
-
MMBtu
|
- | |
| 06 | 3.4116: Meter recycled water (to reduce sewer charges) | $2,334 | - | - | - | - | - | $2,334 | |
| 07 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $2,178 | - | - | - | $2,178 | - | - | |
| 08 | 2.2437: Recover waste heat from equipment | $888 | $1,140 | - | - | - |
$888
-
MMBtu
|
- | |
| TOTAL RECOMMENDED | $46,893 | $13,254 |
$28,677
531,297
kWh
|
$8,311
-
kW-mo/yr
|
$2,178 |
$5,393
-
MMBtu
|
$2,334 | ||
| TOTAL IMPLEMENTED | $36,988 | $6,453 |
$28,677
531,297
kWh
|
$8,311
-
kW-mo/yr
|
- | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | One-time Revenue or Avoided Cost Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs