ITAC Assessment: WI0274
ITAC logo
ITAC Assessment: WI0274
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Commercial printing such as publications, books, manuals, et
NAICS
n/a
SIC 2732: Book Printing
Sales Range $10
M
to 50
M
# of Employees 50
Plant Area 35,000
ft2
Annual Production 1,250,000
lb
Production Hrs. Annual 4,120
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $67,214 691,383
kWh
Electricity Demand $31,549 2,574
kW-mo/yr
Electricity Fees $1,862 -
Natural Gas $6,952 1,492
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $17,834 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $5,066

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Water Consumption Savings
01 3.6192: Use a less expensive method of waste removal $8,100 - - - - $8,100
-
gal
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $2,613 $1,400 $1,380
33,705
kWh
$1,905
-
kW-mo/yr
$(-672.0)
-
MMBtu
- -
03 2.7251: Reduce air conditioning load by evaporating water from roof $3,082 $10,500 $1,263
31,067
kWh
$1,248
-
kW-mo/yr
- - $571
-
Tgal
04 2.7221: Lower temperature during the winter season and vice-versa $1,686 - $1,686
41,325
kWh
- - - -
05 2.7447: Install vinyl strip / high speed / air curtain doors $905 $700 - - $905
-
MMBtu
- -
06 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas $748 $1,000 $567
13,775
kWh
$181
-
kW-mo/yr
- - -
07 2.7135: Install occupancy sensors $369 $900 $369
9,086
kWh
- - - -
08 2.4221: Install compressor air intakes in coolest locations $331 $640 $189
4,689
kWh
$142
-
kW-mo/yr
- - -
TOTAL RECOMMENDED $17,834 $15,140 $5,454
133,647
kWh
$3,476
-
kW-mo/yr
$233
-
MMBtu
$8,100
-
gal
$571
-
Tgal
TOTAL IMPLEMENTED $5,066 $12,840 $2,019
49,531
kWh
$1,571
-
kW-mo/yr
$905
-
MMBtu
- $571
-
Tgal
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Other Liquid (haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs