Assessment Year | 1996 |
---|---|
Principal Product | Commercial printing such as publications, books, manuals, et |
NAICS |
n/a
|
SIC | 2732: Book Printing |
Sales Range | $10 M to 50M |
# of Employees | 50 |
Plant Area |
35,000
ft2
|
Annual Production | 1,250,000
lb
|
Production Hrs. Annual | 4,120
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $67,214 | 691,383 |
kWh
|
$0.097 |
Electricity Demand | $31,549 | 2,574 |
kW-mo/yr
|
$12.26 |
Electricity Fees | $1,862 | - |
|
- |
Natural Gas | $6,952 | 1,492 |
MMBtu
|
$4.66 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $17,834 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $5,066 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Water Consumption Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 3.6192: Use a less expensive method of waste removal | $8,100 | - | - | - | - |
$8,100
-
gal
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,613 | $1,400 |
$1,380
33,705
kWh
|
$1,905
-
kW-mo/yr
|
$(-672.0)
-
MMBtu
|
- | - | |
03 | 2.7251: Reduce air conditioning load by evaporating water from roof | $3,082 | $10,500 |
$1,263
31,067
kWh
|
$1,248
-
kW-mo/yr
|
- | - |
$571
-
Tgal
|
|
04 | 2.7221: Lower temperature during the winter season and vice-versa | $1,686 | - |
$1,686
41,325
kWh
|
- | - | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $905 | $700 | - | - |
$905
-
MMBtu
|
- | - | |
06 | 2.2523: Reduce infiltration to refrigerated areas; isolate hot equipment from refrigerated areas | $748 | $1,000 |
$567
13,775
kWh
|
$181
-
kW-mo/yr
|
- | - | - | |
07 | 2.7135: Install occupancy sensors | $369 | $900 |
$369
9,086
kWh
|
- | - | - | - | |
08 | 2.4221: Install compressor air intakes in coolest locations | $331 | $640 |
$189
4,689
kWh
|
$142
-
kW-mo/yr
|
- | - | - | |
TOTAL RECOMMENDED | $17,834 | $15,140 |
$5,454
133,647
kWh
|
$3,476
-
kW-mo/yr
|
$233
-
MMBtu
|
$8,100
-
gal
|
$571
-
Tgal
|
||
TOTAL IMPLEMENTED | $5,066 | $12,840 |
$2,019
49,531
kWh
|
$1,571
-
kW-mo/yr
|
$905
-
MMBtu
|
- |
$571
-
Tgal
|
||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Water Consumption Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs