Assessment Year | 1996 |
---|---|
Principal Product | Mining Locomotives, Industrial Blow Molding Machines |
NAICS |
n/a
|
SIC | 3532: Mining Machinery and Equipment, Except Oil and Gas Field Machinery and Equipment |
Sales Range | $10 M to 50M |
# of Employees | 87 |
Plant Area |
63,000
ft2
|
Annual Production | 62
pieces
|
Production Hrs. Annual | 2,294
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $49,701 | 473,916 |
kWh
|
$0.10 |
Electricity Demand | $29,431 | 2,406 |
kW-mo/yr
|
$12.23 |
Electricity Fees | $(-364.0) | - |
|
- |
Natural Gas | $9,413 | 2,754 |
MMBtu
|
$3.42 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $16,904 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $10,442 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Primary Raw Material Savings |
---|---|---|---|---|---|---|---|---|---|---|
01 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $8,700 | - | - | - | - | - |
$8,700
-
lb
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $2,497 | $700 |
$819
18,757
kWh
|
$1,898
-
kW-mo/yr
|
$(-220.0)
-
MMBtu
|
- | - | - | |
03 | 3.2123: Convert to high volume low pressure (hvlp) paint guns | $1,508 | $500 | - | - | - | - | - | $1,508 | |
04 | 2.7251: Reduce air conditioning load by evaporating water from roof | $1,202 | $3,900 |
$625
14,361
kWh
|
$577
-
kW-mo/yr
|
- | - | - | - | |
05 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,130 | $1,900 | - | - |
$1,130
-
MMBtu
|
- | - | - | |
06 | 2.7447: Install vinyl strip / high speed / air curtain doors | $125 | $250 | - | - |
$125
-
MMBtu
|
- | - | - | |
07 | 3.8124: Install floating covers on tanks of volatile materials to reduce evaporation | $873 | - | - | - | - |
$873
-
gal
|
- | - | |
08 | 2.7135: Install occupancy sensors | $280 | $600 |
$280
2,052
kWh
|
- | - | - | - | - | |
09 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $172 | $85 |
$80
1,758
kWh
|
$92
-
kW-mo/yr
|
- | - | - | - | |
10 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $124 | $60 |
$62
1,465
kWh
|
$62
-
kW-mo/yr
|
- | - | - | - | |
11 | 2.4221: Install compressor air intakes in coolest locations | $293 | $640 |
$108
2,345
kWh
|
$185
-
kW-mo/yr
|
- | - | - | - | |
TOTAL RECOMMENDED | $16,904 | $8,635 |
$1,974
40,738
kWh
|
$2,814
-
kW-mo/yr
|
$1,035
-
MMBtu
|
$873
-
gal
|
$8,700
-
lb
|
$1,508 | ||
TOTAL IMPLEMENTED | $10,442 | $1,385 |
$530
7,620
kWh
|
$339
-
kW-mo/yr
|
- |
$873
-
gal
|
$8,700
-
lb
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Other Liquid (haz) Savings | Solid Waste (haz) Savings | Primary Raw Material Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs