ITAC Assessment: WI0264
ITAC logo
ITAC Assessment: WI0264
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1996
Principal Product Custom manufacturer machine shop
NAICS
n/a
SIC 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds
Sales Range $10
M
to 50
M
# of Employees 100
Plant Area 95,000
ft2
Annual Production 252,000
lb
Production Hrs. Annual 5,100
hrs
Location (State) Wisconsin

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $88,366 1,510,258
kWh
Electricity Demand $30,612 3,515
kW-mo/yr
Electricity Fees $(-63.0) -
Natural Gas $14,941 2,796
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $32,279 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $2,418

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $4,441 $10,000 $1,063
28,722
kWh
$4,035
-
kW-mo/yr
- $(-657.0)
-
MMBtu
-
02 2.1311: Replace electrically-operated equipment with fossil fuel equipment $3,580 $3,500 $3,059
82,943
kWh
$2,737
-
kW-mo/yr
- $(-2,216.0)
-
MMBtu
-
03 2.7447: Install vinyl strip / high speed / air curtain doors $5,590 $1,400 - - - $5,590
-
MMBtu
-
04 2.7447: Install vinyl strip / high speed / air curtain doors $435 $250 - - - $435
-
MMBtu
-
05 2.7314: Reduce ventilation air $5,466 $500 $46
1,172
kWh
- - $5,420
-
MMBtu
-
06 2.8121: Apply for tax-free status for energy purchases $3,292 - - - $3,292 - -
07 2.7243: Improve air circulation with destratification fans / other methods $977 $3,100 $(-225.0)
(-6,155)
kWh
- - $1,202
-
MMBtu
-
08 2.7261: Install timers and/or thermostats $626 $800 $626
16,999
kWh
- - - -
09 2.7261: Install timers and/or thermostats $1,666 $1,200 - - - $1,666
-
MMBtu
-
10 2.2437: Recover waste heat from equipment $1,608 - - - - $1,608
-
MMBtu
-
11 2.4221: Install compressor air intakes in coolest locations $788 $1,500 $508
13,775
kWh
$280
-
kW-mo/yr
- - -
12 2.3132: Recharge batteries on during off-peak demand periods $810 - - $810
-
kW-mo/yr
- - -
13 3.6193: Install equipment (eg compactor) to reduce disposal costs $3,000 $5,000 - - - - $3,000
-
gal
TOTAL RECOMMENDED $32,279 $27,250 $5,077
137,456
kWh
$7,862
-
kW-mo/yr
$3,292 $13,048
-
MMBtu
$3,000
-
gal
TOTAL IMPLEMENTED $2,418 - - $810
-
kW-mo/yr
- $1,608
-
MMBtu
-
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Electricity Fees Savings Natural Gas Savings Other Liquid (non-haz) Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs