Assessment Year | 1996 |
---|---|
Principal Product | Custom manufacturer machine shop |
NAICS |
n/a
|
SIC | 3544: Special Dies and Tools, Die Sets, Jigs and Fixtures, and Industrial Molds |
Sales Range | $10 M to 50M |
# of Employees | 100 |
Plant Area |
95,000
ft2
|
Annual Production | 252,000
lb
|
Production Hrs. Annual | 5,100
hrs
|
Location (State) | Wisconsin |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $88,366 | 1,510,258 |
kWh
|
$0.059 |
Electricity Demand | $30,612 | 3,515 |
kW-mo/yr
|
$8.71 |
Electricity Fees | $(-63.0) | - |
|
- |
Natural Gas | $14,941 | 2,796 |
MMBtu
|
$5.34 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $32,279 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $2,418 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $4,441 | $10,000 |
$1,063
28,722
kWh
|
$4,035
-
kW-mo/yr
|
- |
$(-657.0)
-
MMBtu
|
- | |
02 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $3,580 | $3,500 |
$3,059
82,943
kWh
|
$2,737
-
kW-mo/yr
|
- |
$(-2,216.0)
-
MMBtu
|
- | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $5,590 | $1,400 | - | - | - |
$5,590
-
MMBtu
|
- | |
04 | 2.7447: Install vinyl strip / high speed / air curtain doors | $435 | $250 | - | - | - |
$435
-
MMBtu
|
- | |
05 | 2.7314: Reduce ventilation air | $5,466 | $500 |
$46
1,172
kWh
|
- | - |
$5,420
-
MMBtu
|
- | |
06 | 2.8121: Apply for tax-free status for energy purchases | $3,292 | - | - | - | $3,292 | - | - | |
07 | 2.7243: Improve air circulation with destratification fans / other methods | $977 | $3,100 |
$(-225.0)
(-6,155)
kWh
|
- | - |
$1,202
-
MMBtu
|
- | |
08 | 2.7261: Install timers and/or thermostats | $626 | $800 |
$626
16,999
kWh
|
- | - | - | - | |
09 | 2.7261: Install timers and/or thermostats | $1,666 | $1,200 | - | - | - |
$1,666
-
MMBtu
|
- | |
10 | 2.2437: Recover waste heat from equipment | $1,608 | - | - | - | - |
$1,608
-
MMBtu
|
- | |
11 | 2.4221: Install compressor air intakes in coolest locations | $788 | $1,500 |
$508
13,775
kWh
|
$280
-
kW-mo/yr
|
- | - | - | |
12 | 2.3132: Recharge batteries on during off-peak demand periods | $810 | - | - |
$810
-
kW-mo/yr
|
- | - | - | |
13 | 3.6193: Install equipment (eg compactor) to reduce disposal costs | $3,000 | $5,000 | - | - | - | - |
$3,000
-
gal
|
|
TOTAL RECOMMENDED | $32,279 | $27,250 |
$5,077
137,456
kWh
|
$7,862
-
kW-mo/yr
|
$3,292 |
$13,048
-
MMBtu
|
$3,000
-
gal
|
||
TOTAL IMPLEMENTED | $2,418 | - | - |
$810
-
kW-mo/yr
|
- |
$1,608
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Electricity Fees Savings | Natural Gas Savings | Other Liquid (non-haz) Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs