ITAC Assessment: WI0242
ITAC logo
ITAC Assessment: WI0242
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product Sheet Metal products
NAICS
n/a
SIC 2295: Coated Fabrics, Not Rubberized
Sales Range $10
M
to 50
M
# of Employees 60
Plant Area 35,000
ft2
Annual Production 300,000
pieces
Production Hrs. Annual 4,500
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $33,460 361,665
kWh
Natural Gas $24,877 5,408
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $22,972 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Water Consumption Savings
01 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $6,446 $90 n/a $6,446
69,754
kWh
- - -
02 2.4221: Install compressor air intakes in coolest locations $307 $1,280 n/a $307
3,224
kWh
- - -
03 2.7261: Install timers and/or thermostats $3,143 $400 n/a - $3,143
-
MMBtu
- -
04 2.4111: Utilize energy-efficient belts and other improved mechanisms $1,120 - n/a $1,120
12,016
kWh
- - -
05 2.7142: Utilize higher efficiency lamps and/or ballasts $1,079 $1,090 n/a $1,079
11,723
kWh
- - -
06 2.7142: Utilize higher efficiency lamps and/or ballasts $331 $1,080 n/a $331
3,517
kWh
- - -
07 2.7447: Install vinyl strip / high speed / air curtain doors $896 $725 n/a - $896
-
MMBtu
- -
08 3.6193: Install equipment (eg compactor) to reduce disposal costs $6,600 $8,500 n/a - - $6,600
-
lb
-
09 3.1291: Eliminate practice of mixing waste streams $3,050 $4,000 n/a - - - $3,050
-
Tgal
TOTAL RECOMMENDED $22,972 $17,165 $9,283
100,234
kWh
$4,039
-
MMBtu
$6,600
-
lb
$3,050
-
Tgal
TOTAL IMPLEMENTED - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Solid Waste (non-haz) Savings Water Consumption Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs