| Assessment Year | 1993 |
|---|---|
| Principal Product | Video Cassette Tape Cases |
| NAICS |
n/a
|
| SIC | 3695: Magnetic And Optical Recording Media |
| Sales Range | $10 M to 50M |
| # of Employees | 140 |
| Plant Area |
120,000
ft2
|
| Annual Production | 0
units
|
| Production Hrs. Annual | 8,736
hrs
|
| Location (State) | Illinois |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $717,220 | 12,151,524 |
kWh
|
$0.059 |
| Natural Gas | $10,644 | 2,484 |
MMBtu
|
$4.29 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $64,546 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|
| 01 | 2.7226: Use computer programs to optimize hvac performance | $22,197 | $48,000 |
$22,197
376,026
kWh
|
- | |
| 02 | 2.2511: Insulate bare equipment | $11,890 | $147 |
$11,890
201,348
kWh
|
- | |
| 03 | 2.7252: Utilize an evaporative air pre-cooler or other heat exchanger in ac system | $10,533 | $36,000 |
$10,533
278,429
kWh
|
- | |
| 04 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $4,065 | $2,458 |
$4,065
68,875
kWh
|
- | |
| 05 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $195 | - |
$195
3,224
kWh
|
- | |
| 06 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $3,942 | $3,770 |
$3,942
66,823
kWh
|
- | |
| 07 | 2.7135: Install occupancy sensors | $751 | $450 |
$751
12,603
kWh
|
- | |
| 08 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $693 | $1,375 |
$693
11,723
kWh
|
- | |
| 09 | 2.4221: Install compressor air intakes in coolest locations | $6,260 | $3,680 |
$6,260
106,096
kWh
|
- | |
| 10 | 2.7444: Close holes and openings in building such as broken windows | $2,140 | $2,600 |
$2,140
36,342
kWh
|
- | |
| 11 | 2.3132: Recharge batteries on during off-peak demand periods | $900 | - |
$900
-
kWh
|
- | |
| 12 | 2.7447: Install vinyl strip / high speed / air curtain doors | $590 | $300 | - |
$590
-
MMBtu
|
|
| 13 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $390 | $700 |
$565
9,672
kWh
|
$(-175.0)
-
MMBtu
|
|
| TOTAL RECOMMENDED | $64,546 | $99,480 |
$64,131
1,171,161
kWh
|
$415
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs