ITAC Assessment: WI0151
ITAC logo
ITAC Assessment: WI0151
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product AUTOMOBILE SWITCHES
NAICS
n/a
SIC 3679: Electronic Components, Not Elsewhere Classified
Sales Range $1
M
to 5
M
# of Employees 170
Plant Area
n/a
Annual Production 350,000
pieces
Production Hrs. Annual 2,125
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $108,858 1,371,630
kWh
Natural Gas $13,436 3,587
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $11,121 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,643

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $4,528 $200 - $4,528
-
MMBtu
-
02 2.7221: Lower temperature during the winter season and vice-versa $783 - - $783
-
MMBtu
-
03 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,055 - $1,055
-
kWh
- -
04 2.7142: Utilize higher efficiency lamps and/or ballasts $134 $9 $617
7,913
kWh
- $(-483.0)
05 2.6232: Install set-back timers $311 $400 $311
3,810
kWh
- -
06 2.7447: Install vinyl strip / high speed / air curtain doors $2,571 $2,100 - $2,571
-
MMBtu
-
07 2.2437: Recover waste heat from equipment $938 - - $938
-
MMBtu
-
08 2.1311: Replace electrically-operated equipment with fossil fuel equipment $801 - $1,003
12,603
kWh
$(-202.0)
-
MMBtu
-
TOTAL RECOMMENDED $11,121 $2,709 $2,986
24,326
kWh
$8,618
-
MMBtu
$(-483.0)
TOTAL IMPLEMENTED $3,643 $2,109 $617
7,913
kWh
$3,509
-
MMBtu
$(-483.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs