| Assessment Year | 2010 |
|---|---|
| Principal Product | Paper plates, Paper Cups, Napkins |
| NAICS | 322299: All Other Converted Paper Product Manufacturing |
| SIC | 2679: Converted Paper and Paperboard Products, Not Elsewhere Classified |
| Sales Range | $100 M to 500M |
| # of Employees | 232 |
| Plant Area |
588,000
ft2
|
| Annual Production | 201,332,862
pieces
|
| Production Hrs. Annual | 4,160
hrs
|
| Location (State) | Michigan |
Facility Energy Cost and Usage
| Source | Yearly Cost | Usage | Unit Cost | |
|---|---|---|---|---|
| Electricity Usage | $550,751 | 6,973,478 |
kWh
|
$0.079 |
| Electricity Demand | $195,692 | 15,351 |
kW-mo/yr
|
$12.75 |
| Natural Gas | $202,159 | 21,349 |
MMBtu
|
$9.47 |
| TOTAL YEARLY COSTS | - | |||
| RECOMMENDED SAVINGS* | $179,877 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
| IMPLEMENTED SAVINGS* | - | |||
Recommendations
| # | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings |
|---|---|---|---|---|---|---|---|
| 01 | 2.2437: Recover waste heat from equipment | $8,778 | $1,000 | - | - |
$8,778
-
MMBtu
|
|
| 02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $65,841 | $24,120 |
$37,774
763,119
kWh
|
$28,067
-
kW-mo/yr
|
- | |
| 03 | 2.7243: Improve air circulation with destratification fans / other methods | $24,348 | $8,750 | - | - |
$24,348
-
MMBtu
|
|
| 04 | 2.7135: Install occupancy sensors | $14,135 | $31,924 |
$14,135
178,923
kWh
|
- | - | |
| 05 | 2.3212: Optimize plant power factor | $6,734 | $14,340 |
$6,734
-
kWh
|
- | - | |
| 06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $4,240 | $200 |
$2,327
47,008
kWh
|
$1,913
-
kW-mo/yr
|
- | |
| 07 | 2.7231: Use radiant heater for spot heating | $45,305 | $14,000 | - | - |
$45,305
-
MMBtu
|
|
| 08 | 2.4221: Install compressor air intakes in coolest locations | $3,583 | $2,000 |
$1,352
27,306
kWh
|
$2,231
-
kW-mo/yr
|
- | |
| 09 | 2.7263: Lower compressor pressure through a/c system modification | $6,913 | $2,000 |
$6,913
139,651
kWh
|
- | - | |
| TOTAL RECOMMENDED | $179,877 | $98,334 |
$69,235
1,156,007
kWh
|
$32,211
-
kW-mo/yr
|
$78,431
-
MMBtu
|
||
| TOTAL IMPLEMENTED | - | - | - | - | - | ||
| Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | |||
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs