ITAC Assessment: AS0073
ITAC logo
ITAC Assessment: AS0073
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product PLASTIC INJECTION MOLDS
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 130
Plant Area
n/a
Annual Production 143,612
pieces
Production Hrs. Annual 8,736
hrs
Location (State) Arizona

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $453,088 7,586,460
kWh
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,070 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $55,070

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Administrative Changes Savings
01 2.4133: Use most efficient type of electric motors $1,226 $5,173 $1,226
20,516
kWh
-
02 2.7312: Minimize use of outside make-up air for ventilation except when used for economizer cycle $11,610 $9,350 $11,610
194,607
kWh
-
03 2.7422: Plant trees or shrubs near windows to shield from sunlight $245 $400 $245
4,103
kWh
-
04 2.7221: Lower temperature during the winter season and vice-versa $5,325 - $5,325
89,097
kWh
-
05 2.2614: Use cooling tower or economizer to replace chiller cooling $3,124 $6,200 $3,124
52,462
kWh
-
06 2.4146: Use adjustable frequency drive or multiple speed motors on existing system $354 $1,072 $354
5,862
kWh
-
07 2.7142: Utilize higher efficiency lamps and/or ballasts $8,554 $18,562 $8,890
148,886
kWh
$(-336.0)
08 2.7142: Utilize higher efficiency lamps and/or ballasts $9,444 $13,440 $11,025
184,642
kWh
$(-1,581.0)
09 2.7226: Use computer programs to optimize hvac performance $4,072 $1,800 $4,072
68,288
kWh
-
10 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $8,060 $400 $8,060
135,111
kWh
-
11 2.4231: Reduce the pressure of compressed air to the minimum required $3,056 $2,000 $3,056
51,290
kWh
-
TOTAL RECOMMENDED $55,070 $58,397 $56,987
954,864
kWh
$(-1,917.0)
TOTAL IMPLEMENTED $55,070 $58,397 $56,987
954,864
kWh
$(-1,917.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs