ITAC Assessment: WI0148
ITAC logo
ITAC Assessment: WI0148
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1992
Principal Product TRIPODS
NAICS
n/a
SIC 3861: Photographic Equipment and Supplies
Sales Range $1
M
to 5
M
# of Employees 54
Plant Area
n/a
Annual Production 16,500
pieces
Production Hrs. Annual 2,250
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $46,907 573,564
kWh
Natural Gas $8,691 2,337
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $6,241 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $3,101

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
01 2.7261: Install timers and/or thermostats $2,857 $400 - $2,857
-
MMBtu
-
02 2.3131: Reschedule plant operations or reduce load to avoid peaks $1,889 - $2,009
-
kWh
- $(-120.0)
03 2.7142: Utilize higher efficiency lamps and/or ballasts $110 $2 $164
2,052
kWh
- $(-54.0)
04 2.6232: Install set-back timers $532 $400 $532
6,448
kWh
- -
05 2.7133: Use separate switches on perimeter lighting which may be turned off when natural light is available $97 $75 $97
1,172
kWh
- -
06 2.1123: Install automatic stack damper $547 $700 - $547
-
MMBtu
-
07 2.4221: Install compressor air intakes in coolest locations $134 $640 $134
1,758
kWh
- -
08 2.6214: Shut off pilots in standby equipment $75 - - $75
-
MMBtu
-
TOTAL RECOMMENDED $6,241 $2,217 $2,936
11,430
kWh
$3,479
-
MMBtu
$(-174.0)
TOTAL IMPLEMENTED $3,101 $1,042 $298
3,810
kWh
$2,857
-
MMBtu
$(-54.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Natural Gas Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs