ITAC Assessment: ME0160
ITAC logo
ITAC Assessment: ME0160
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 1995
Principal Product molded polyurethane products
NAICS
n/a
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $10
M
to 50
M
# of Employees 200
Plant Area 79,200
ft2
Annual Production 10,000,000
pieces
Production Hrs. Annual 8,400
hrs
Location (State) Maine

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $454,859 5,482,415
kWh
Natural Gas $51,721 7,086
MMBtu
Fuel Oil #2 $14,586 2,800
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $270,931 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $21,436

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Fuel Oil #2 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $58,511 $73,282 $82,249
936,694
kWh
$(-23,738.0)
-
MMBtu
- - -
02 2.7142: Utilize higher efficiency lamps and/or ballasts $9,765 $18,720 $9,765
117,526
kWh
- - - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $3,889 $600 $3,889
43,669
kWh
- - - -
04 2.4239: Eliminate or reduce compressed air usage $2,986 $1,700 $2,986
35,756
kWh
- - - -
05 2.4221: Install compressor air intakes in coolest locations $2,408 $750 $2,408
39,566
kWh
- - - -
06 2.8121: Apply for tax-free status for energy purchases $781 - - - - - $781
07 2.8123: Pay utility bills on time $532 - - - - - $532
08 2.8123: Pay utility bills on time $500 - - - - - $500
09 3.2123: Convert to high volume low pressure (hvlp) paint guns $184,809 $7,514 - - $184,809
-
gal
- -
10 3.5315: Lease / purchase baler; sell cardboard to recycler $3,750 $10,000 - - - $3,750
-
lb
-
11 3.5316: Contract a wood pallet recycling company $3,000 - - - - $3,000
-
lb
-
TOTAL RECOMMENDED $270,931 $112,566 $101,297
1,173,211
kWh
$(-23,738.0)
-
MMBtu
$184,809
-
gal
$6,750
-
lb
$1,813
TOTAL IMPLEMENTED $21,436 $29,320 $13,654
161,195
kWh
- - $6,750
-
lb
$1,032
Yearly Savings* Imp'd Cost* Electricity Usage Savings Fuel Oil #2 Savings Other Liquid (non-haz) Savings Solid Waste (non-haz) Savings Administrative Changes Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs