ITAC Assessment: BD0181
ITAC logo
ITAC Assessment: BD0181
Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2001
Principal Product Printed Circuit Boards
NAICS
n/a
SIC 3672: Printed Circuit Boards
Sales Range $10
M
to 50
M
# of Employees 106
Plant Area 67,000
ft2
Annual Production 40,000
pieces
Production Hrs. Annual 6,240
hrs
Location (State) Illinois

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $281,246 6,725,616
kWh
Electricity Demand $151,545 12,397
kW-mo/yr
Electricity Fees $480 -
Natural Gas $86,532 23,705
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $55,329 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* -

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
01 2.1311: Replace electrically-operated equipment with fossil fuel equipment $12,426 $17,500 n/a $12,880
463,320
kWh
$6,553
-
kW-mo/yr
$(-7,007.0)
-
MMBtu
- - -
02 2.1123: Install automatic stack damper $5,898 $8,000 n/a - - $5,898
-
MMBtu
- - -
03 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $2,193 $600 $1,189
42,733
kWh
$1,004
-
kW-mo/yr
- - - -
04 2.4221: Install compressor air intakes in coolest locations $1,608 $1,000 $984
35,373
kWh
$624
-
kW-mo/yr
- - - -
05 2.4133: Use most efficient type of electric motors $1,047 $2,060 $641
23,072
kWh
$406
-
kW-mo/yr
- - - -
06 2.7135: Install occupancy sensors $908 $675 $333
12,025
kWh
$575
-
kW-mo/yr
- - - -
07 2.1222: Install turbulators $599 $1,700 - - $599
-
MMBtu
- - -
08 3.4113: Treat and reuse rinse waters $25,872 $12,000 n/a - - - $25,872
-
Tgal
- -
09 4.521: Clear and rent existing space $4,700 $2,500 - - - - $4,700 -
10 4.821: Pay bills on time to avoid late fees $78 - - - - - - $78
TOTAL RECOMMENDED $55,329 $46,035 $16,027
576,523
kWh
$9,162
-
kW-mo/yr
$(-510.0)
-
MMBtu
$25,872
-
Tgal
$4,700 $78
TOTAL IMPLEMENTED - - - - - - - -
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Water Disposal Savings Administrative Changes Savings One-time Revenue or Avoided Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs