Assessment Year | 2013 |
---|---|
Principal Product | Vinyl windows |
NAICS | 326199: All Other Plastics Product Manufacturing |
SIC | 3089: Plastics Products, Not Elsewhere Classified |
Sales Range | $100 M to 500M |
# of Employees | 600 |
Plant Area |
312,960
ft2
|
Annual Production | 875,000
pieces
|
Production Hrs. Annual | 5,125
hrs
|
Location (State) | North Carolina |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $660,308 | 7,201,800 |
kWh
|
$0.092 |
Electricity Demand | $144,388 | 18,036 |
kW-mo/yr
|
$8.01 |
Natural Gas | $28,305 | 3,320 |
MMBtu
|
$8.53 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $278,584 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,203 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
---|---|---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $128,043 | $171,848 |
$110,234
1,202,376
kWh
|
$19,251
-
kW-mo/yr
|
- | - | $(-1,442.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $7,179 | $7,472 |
$6,111
66,660
kWh
|
$1,068
-
kW-mo/yr
|
- | - | - | |
03 | 2.7135: Install occupancy sensors | $16,865 | $10,990 |
$16,865
183,955
kWh
|
- | - | - | - | |
04 | 2.1311: Replace electrically-operated equipment with fossil fuel equipment | $107,579 | $110,000 |
$133,205
1,452,938
kWh
|
$27,233
-
kW-mo/yr
|
$(-52,859.0)
-
MMBtu
|
- | - | |
05 | 2.2437: Recover waste heat from equipment | $7,771 | $1,900 | - | - |
$7,771
-
MMBtu
|
- | - | |
06 | 2.4231: Reduce the pressure of compressed air to the minimum required | $9,944 | $3,969 |
$8,270
90,200
kWh
|
$1,674
-
kW-mo/yr
|
- | - | - | |
07 | 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves | $1,203 | $100 |
$1,447
15,785
kWh
|
$296
-
kW-mo/yr
|
- | $(-300.0) | $(-240.0) | |
TOTAL RECOMMENDED | $278,584 | $306,279 |
$276,132
3,011,914
kWh
|
$49,522
-
kW-mo/yr
|
$(-45,088.0)
-
MMBtu
|
$(-300.0) | $(-1,682.0) | ||
TOTAL IMPLEMENTED | $1,203 | $100 |
$1,447
15,785
kWh
|
$296
-
kW-mo/yr
|
- | $(-300.0) | $(-240.0) | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Electricity Demand Savings | Natural Gas Savings | Personnel Changes Savings | Ancillary Material Cost Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs