Grant Funding Opportunity NOW OPEN
Up to $300k at 50% cost share for qualifying* projects.
Grant Funding Opportunity Open
Qualifying* small and medium-sized US manufacturers, that received an ITAC, Onsite Energy/CHP TAP, or qualified equivalent assessment since 2018 can now apply for grants for implementation of assessment recommendations at up to 50% of qualifying* project costs with a maximum of $300,000 per grant.
IMPORTANT: The grant program now operates on a rolling basis and applications may be submitted at any time through the year, with quarterly reviews.
*See Full Grant Solicitation for full qualification and selection details.
Assessment Year 2013
Principal Product Vinyl windows
NAICS 326199: All Other Plastics Product Manufacturing
SIC 3089: Plastics Products, Not Elsewhere Classified
Sales Range $100
M
to 500
M
# of Employees 600
Plant Area 312,960
ft2
Annual Production 875,000
pieces
Production Hrs. Annual 5,125
hrs
Location (State) North Carolina

Facility Energy Cost and Usage

Source Yearly Cost Usage
Electricity Usage $660,308 7,201,800
kWh
Electricity Demand $144,388 18,036
kW-mo/yr
Natural Gas $28,305 3,320
MMBtu
TOTAL YEARLY COSTS -
RECOMMENDED SAVINGS* $278,584 *Non-energy impacts included in savings.
IMPLEMENTED SAVINGS* $1,203

Recommendations

# Description Yearly Savings* Imp'd Cost* Status Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
01 2.7142: Utilize higher efficiency lamps and/or ballasts $128,043 $171,848 $110,234
1,202,376
kWh
$19,251
-
kW-mo/yr
- - $(-1,442.0)
02 2.7142: Utilize higher efficiency lamps and/or ballasts $7,179 $7,472 $6,111
66,660
kWh
$1,068
-
kW-mo/yr
- - -
03 2.7135: Install occupancy sensors $16,865 $10,990 $16,865
183,955
kWh
- - - -
04 2.1311: Replace electrically-operated equipment with fossil fuel equipment $107,579 $110,000 $133,205
1,452,938
kWh
$27,233
-
kW-mo/yr
$(-52,859.0)
-
MMBtu
- -
05 2.2437: Recover waste heat from equipment $7,771 $1,900 - - $7,771
-
MMBtu
- -
06 2.4231: Reduce the pressure of compressed air to the minimum required $9,944 $3,969 $8,270
90,200
kWh
$1,674
-
kW-mo/yr
- - -
07 2.4236: Eliminate leaks in inert gas and compressed air lines/ valves $1,203 $100 $1,447
15,785
kWh
$296
-
kW-mo/yr
- $(-300.0) $(-240.0)
TOTAL RECOMMENDED $278,584 $306,279 $276,132
3,011,914
kWh
$49,522
-
kW-mo/yr
$(-45,088.0)
-
MMBtu
$(-300.0) $(-1,682.0)
TOTAL IMPLEMENTED $1,203 $100 $1,447
15,785
kWh
$296
-
kW-mo/yr
- $(-300.0) $(-240.0)
Yearly Savings* Imp'd Cost* Electricity Usage Savings Electricity Demand Savings Natural Gas Savings Personnel Changes Savings Ancillary Material Cost Savings
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs