Assessment Year | 1992 |
---|---|
Principal Product | COMMERCIAL SPRINTING |
NAICS |
n/a
|
SIC | 2752: Commercial Printing, Lithographic |
Sales Range | $10 M to 50M |
# of Employees | 125 |
Plant Area |
n/a
|
Annual Production | 0
units
|
Production Hrs. Annual | 6,000
hrs
|
Location (State) | Illinois |
Facility Energy Cost and Usage
Source | Yearly Cost | Usage | Unit Cost | |
---|---|---|---|---|
Electricity Usage | $126,998 | 1,806,565 |
kWh
|
$0.070 |
Natural Gas | $6,057 | 1,557 |
MMBtu
|
$3.89 |
TOTAL YEARLY COSTS | - | |||
RECOMMENDED SAVINGS* | $8,996 |
See individual recommendations below
*Non-energy impacts included in savings.
|
||
IMPLEMENTED SAVINGS* | $1,759 |
Recommendations
# | Description | Yearly Savings* | Imp'd Cost* | Status | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
---|---|---|---|---|---|---|---|
01 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $1,420 | $3,472 |
$1,832
26,084
kWh
|
- | $(-412.0) | |
02 | 2.7142: Utilize higher efficiency lamps and/or ballasts | $360 | $1,460 |
$360
5,275
kWh
|
- | - | |
03 | 2.7447: Install vinyl strip / high speed / air curtain doors | $1,759 | $2,350 | - |
$1,759
-
MMBtu
|
- | |
04 | 2.3135: Schedule routine maintenance during non-operating periods | $1,285 | - |
$1,525
-
kWh
|
- | $(-240.0) | |
05 | 2.3131: Reschedule plant operations or reduce load to avoid peaks | $836 | - |
$1,236
-
kWh
|
- | $(-400.0) | |
06 | 2.4111: Utilize energy-efficient belts and other improved mechanisms | $1,269 | $2,135 |
$1,269
18,171
kWh
|
- | - | |
07 | 2.4133: Use most efficient type of electric motors | $51 | $742 |
$51
879
kWh
|
- | - | |
08 | 2.7226: Use computer programs to optimize hvac performance | $760 | $2,800 |
$760
10,844
kWh
|
- | - | |
09 | 2.7261: Install timers and/or thermostats | $747 | $200 | - |
$747
-
MMBtu
|
- | |
10 | 2.7221: Lower temperature during the winter season and vice-versa | $171 | - | - |
$171
-
MMBtu
|
- | |
11 | 2.4221: Install compressor air intakes in coolest locations | $338 | $640 |
$338
4,689
kWh
|
- | - | |
TOTAL RECOMMENDED | $8,996 | $13,799 |
$7,371
65,942
kWh
|
$2,677
-
MMBtu
|
$(-1,052.0) | ||
TOTAL IMPLEMENTED | $1,759 | $2,350 | - |
$1,759
-
MMBtu
|
- | ||
Yearly Savings* | Imp'd Cost* | Electricity Usage Savings | Natural Gas Savings | Administrative Changes Savings |
*Savings and costs are best estimates based on the center's site visit, associated engineering analysis, and typical capital and labor costs